Collect all the information on each subsystem for the target group. Currently, we are aiming to have some kind of a complete draft on Aug 1, 2023.

  1. Target Operator
  2. Target Expert
  3. Target Shifts
  4. Full System P&ID: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=5834
  5. QT System Manual
  6. Magnet System Manual
  7. Fridge System Manual
  8. Target Lifter Manual
  9. UVA-NMR System Manual
  10. LANL NMR System Manual
  11. Microwave System Manual
  12. Roots-Pump System Manual
  13. Target-Insert Manual
  14. Target Materials Manual
  15. Target Insert Unloading and Loading Procedure
  16. Annealing System Manual
  17. Device and Software for Readout and Control
  18. Cooldown Checklist
  19. Slow Cooldown Procedure
  20. What to do when there is a planned power outage?
  21. Target System Maintenance
  22. Spinquest Target System ORCs
  23. Useful Engineering Notes
  24. Magnet Slow cooldown plan
  25. DNP CH2 Target Polarization procedure
  26. TE Calibration with the SpinQuest Polarized Target System
  27. How to order LHe 250L Dewars, LN2 refill to the tank, gHe tube-trailer, LN gHe cylinders, and LN2 portable Dewars at FNAL
  28. System Constants
  29. Useful information for troubleshooting


Images and Graphics

  1. Pictures at NM4
  2. 3D Model Images


Useful Manuals