N | ORC-ID # | Title | Submitted | Reviewed | Approved | Div. Signed | Who | Notes | Sub-system |
1 | 1834 | E1039 Microwave Test Stand | 1 | 1 | 1 | 1 | W.Ahmed |
| Microwave |
| 1834.01 | E1039 Microwave Test Stand |
|
|
|
|
| deprecated? | Microwave |
| 1834.02 | E1039 Microwave Test Stand (new control box) |
|
|
|
|
| deprecated? | Microwave |
2 | 1837 | E1039 Target Lifter System | 1 | 1 | 1 | 1 | V.Bandara |
| Target Lifter |
| 1837.01 | E1039 Target Lifter Addendum (re-installation) | 1 | 1 | 1 | 1 | V.Bandara | Re-installation of the lifter in the target cave | Target Lifter |
3 | 1847 | E1039 Roots Vacuum | 1 | 1 | 1 | 1 | A.Arora |
| Roots |
| 1847.03 | E1039 addendum to ORC-1847 for gHe recovery piping | 1 | 1 | 1 | 1 |
| includes roots exhaust | Roots |
4 | 1853 | E1039 Magnet Power Supply Rack | 1 | 1 | 1 | 1 | W.Ahmed |
| Magnet |
5 | 1854 | E1039 NMR system part 1 (custom electronics) | 1 | 1 | 1 | 1 | I. Fernando |
| NMR |
6 | 1857 | E1039 Liquefaction Electrical System | 1 | 1 | 1 | 1 | W.Ahmed |
| UVA-QT |
| 1857.01 | E1039 Liquefaction Electrical System | 1 | 1 | 1 | 1 | W.Ahmed | Small PLC cabinet on west wall | UVA-QT |
7 | 1865 | E1039 Target Lifter Control System | 1 | 1 | 1 | 1 | V.Bandara |
| Target Lifter |
8 | 1866 | E1039 Target Lifter ADC System | 1 | 1 | 1 | 1 | V.Bandara |
| Target Lifter |
9 | 1867 | E1039 AC power dist for slow controls rack | 1 | 1 | 1 | 1 | S.Chappa |
| Slow Controls Rack |
10 | 1877 | E1039 Target lifter monitor | 1 | 1 | 1 | 1 | V.Bandera |
| Target Lifter |
11 | 1888 | E1039 NMR system part 2 (commercial components) | 1 | 1 | 1 | 1 | I.Fernando |
| NMR |
12 | 1888.01 | E1039 NMR addendum | 1 | 1 | 1 | 1 | I.Fernando |
| NMR |
13 | 1895 | E1039 Slow controls rack for the SpinQuest experiment | 1 | 1 | 1 | 1 | Z.Akbar |
| Slow Controls Rack |
14 | 1933 | E1039 NMR rack quiet AC power | 1 | 1 | 1 | 1 | S.Chappa/RJT |
| NMR |
15 | 1934 | E1039 Microwave motor controlling system (exp. Hall) | 1 | 1 | 1 | 1 | V.Bandara |
| Microwave |
16 | 1938 | E1039 Helium Liquefaction plant | 1 | 1 | 1 | 1 | RJT/D.Keller |
| UVA-QT |
17 | 1941 | E1039 ODH & Hazardous Gas Controls | 1 | 1 | 1 | 1 | K.Overhage |
| ODH |
18 | 1954 | Spinquest (E1039) Fridge valve controlling system | 1 | 1 | 1 | 1 | V.Bandara |
| Fridge |
19 | 1968 | E1039 Microwave test setup at counting hall | 1 | 1 | 1 | 1 | W.Ahmed |
| Microwave |
20 | 1969 | E1039 Microwave setup in Hall | 1 | 1 | 1 | 1 | W.Ahmed |
| Microwave |
| 1969.01 | E1039 Microwave setup in Hall (reinstall) | 1 | 1 | 1 | 1 | V.Bandara | Re-ORC after disassembly | Microwave |
21 | 1970 | E1039 Annealing system at Hall (slow controls rack) | 1 | 1 | 1 | 1 | W.Ahmed | examine all 1970 docs. | Annealing |
| 1970.01 | E1039 Annealing system (Roots gate valve control box) | 1 | 1 | 1 | 1 | W.Ahmed |
| Annealing |
22 | 1982 | E1039 Magnet Power supply rack update | 1 | 1 | 1 | 1 | W. Ahmed |
| Magnet |
| 1982.01 | E1039 Helium level addendum to ORC-1982 | 1 | 1 | 1 | 1 | W. Ahmed |
| Magnet |
23 | 1983 | E1039 Update Roots vacuum | 1 | 1 | 1 | 1 | W. Ahmed |
| Roots |
24 | 1984 | E1039 VME based NMR system (LANL) | 1 | 1 | 1 | 1 | W. Ahmed |
| NMR |
| 1984.01 | E1039 VME based NMR system Addendum (LANL) | 1 | 1 | 1 | 1 | M.Yurov |
| NMR |
26 | 2002 | E1039 LN2 delivery and gN2 vent piping | 1 | 1 | 1 | 1 | J.Kintner/RJT |
| LN2 piping |
27 | 2008 | E1039 Liquid Helium transfer and cooldown piping | 1 | 1 | 1 | 1 | J.Kintner/RJT |
| LHe piping |
25 | 2046 | E1039 NM4 ODH Controls | 1 | 1 | 1 | 1 | K.Overhage |
| ODH |
28 | 2049 | E1039 Target Magnet (electronics) | 1 | 1 | 1 | 1 | I.Fernando |
| Magnet |
29 | 2050 | E1039 Target Fridge (electronics) | 1 | 1 | 1 | 1 | K.Nakano |
| Fridge |
30 | 2053 | E1039 Target cave Helium, nitrogen piping | 1 | 1 | 1 | 1 | V.Bandara |
| Piping |
31 | 2056 | Target Magnet (cooldown cryogenics/mechanical) | 1 | 1 | 1 | 1 | I.Fernando |
| Magnet |
|
| Target magnet (Fridge addendum) | 1 | 1 | 1 | 1 |
|
| Magnet |
32 | 2071 | Target Magnet Powerup | 1 | 1 | 1 | 1 | I.Fernando |
| Magnet and Fridge |
34 | 2137 | E1039 Target Gate Valve bypass valve control box | 1 | 1 | 1 | 1 | V.Bandara |
| Piping and Roots |
35 | 2162 | Polarized target insert (electronics & microwave) | 1 | 1 | 1 | 1 | I.Fernando | Delegated to E.Niner | Insert |
36 | 2167 | 2nd Microwave control box (for test stand) | 1 | 1 | 1 | 1 | V.Bandara |
| Microwave |
37 | 2171 | Heat Tape for target cryostat | 1 | 1 | 1 | 1 | K.Nakano |
| Magnet |
38 | 2186 | NMR Test Stand | 1 | 1 | 1 | 1 | A.Pattividana | L.Reger | NMR |
39 | 2199 | Outdoor gHe tank pressure/temp sensors & readout | 1 | 1 | 1 | 1 | K.Nakano |
| Slow Controls |
40 | 2201 | Magnet gHe flow controller bypass control electronics | 1 | 1 | 1 | 1 | V.Bandara |
| Slow Controls |
41 | 2205 | Temperature sensors for cryo-compressor water system | 1 | 1 | 1 | 1 | K.Nakano |
| Slow Controls |
42 | 2213 | UVa NMR 3 channel box (test stand) | 1 | 1 | 1 | 1 | A.Pattividana |
| NMR |
43 | 2164 | Final beam ORC for the experiment |
|
|
|
| R.Tesarek |
|
|
44 |
|
|
|
|
|
|
|
|
|
|
| Total |
|
|
| 196 |
|
|
|