- Beginning of shift
- Arrive at NM4 at least five minutes before the start time of your shift. Take over the status and the plan of the target system from the outgoing shifter.
- If the Shift Leader is absent, call MCR (x3721) and say something like "This is <YOUR NAME> at SpinQuest (NM4), and we are starting a new shift." The MCR person will thank you.
- If the Shift Leader is absent, complete the "Beginning of Shift" form in the ECL elog.
- Go through the Target Operator Checklist for the beginning and the end of the shiftShift Report : ← copy this list and add an ECL elog based on those values.
- Confirm that the "Active Alarm for Target Operator" page is functioning on "uva-nuc-02", as instructed in this page.
- Every hour
- Confirm that all computers/programs are running (not got stuck), including the QT HMI screen, the PDP screen, the target computer, the microwave+lifter computer, "uva-nuc-01" and "uva-nuc-02".
- Check all strip charts and communicate with the Target Expert immediately if you notice anything unusual: especially IVC, LCW flow, LCW pressure, LCW temperature, LCW temperatures on QT compressors
- On-demand
- Manipulate the Microwave Control system in case of the "Production" mode.
- Respond to all target-related alarms, as instructed in this page.
- End of shift
- Hand over details to the incoming shifter.
- If the Shift Leader is absent, complete the "End of Shift" form in the ECL.
...
- How to control the Magnet Return flow
- How to control the Separator Return flow
- How to control the Fridge Return flow (GV and GV Bypass)
- How to Open or Close Fridge Valves
- Fridge Filling Procedure (Warm Filling) Using Bypass Valve
- Fridge Filling Procedure (Cold Filling) Using Run Valve from any level of Liquid Helium in the Fridge
- Helium Liquefier (QT) System Summary
- Microwave Operation
- Roots pumps PLC interface
- How to identify the fridge LHe level
- How to fill LN2 to the Purifier and Magnet LN2 spaces
...