Each TO during the Swing shift needs to make sure of the following things:
- Calculate the Consumption rate, Production rate, and Magnet Seam level using the following PHP script.
Please see the link to the PHP script: Combined Calculators (fnal.gov)
- Calculate the LHe loss using the following Python script.