Each TO during the Swing shift needs to make sure of the following things:

  1. Calculate the Consumption rate, Production rate, and Magnet Seam level using the following PHP script. 

Please see the link to the PHP script: Combined Calculators (fnal.gov)


Please see the link to the PHP script Combined Calculators (fnal.gov) to see the Magnet Seam Level and arrange a Magnet fill the next day during the Morning Shift. 


  1. Calculate the LHe loss using the following Strip Charts.

    https://e906-gat1.fnal.gov/data-summary/e1039/target-par-preset/total_LHe_stat.php

     



  • No labels