- Drawing about sensor locations: https://docs.google.com/drawings/d/1tOOoeUHOlIiYZZEKrPSB4e7GuGj3c78bpsnPMUKvgos/edit
TH HFC-303 | 2 | Magnet & Separator | THCD-400 #1 | Slow-control rack | CCP @ Target computer | |
TH HFM-305 | 1 | Fridge | THCD-400 #1 | ditto | CCP @ Target computer | |
??? | 5 | roots LCW inflow | Arduino | Magnet rack | Target computer | Photo wanted. |
??? | 1 | NM4 LCW inflow | ACNET | n/a | Target computer?? | Photo |
Pressure Sensor
- The table below is for a summary. For a more complete pressure information please visit: https://docs.google.com/spreadsheets/d/1Dh6Y27IiEedgq5waZs8_9CsKKFSGWBRfoOAU4PYjFwM/edit?usp=sharing
- Drawing about sensor locations: https://docs.google.com/drawings/d/16cCaIn4SXTD8Wq2xzqePSZeJITV-1SPnE9UjyXzBx5w/edit
Note about installation:
- The biggest issue is where to put MKS 690 1000 Torr. Ideally it should be close to the 100 Torr one
- Please consult with Dustin to make sure about the final location
- Sensor number 3 (He3) and 8 (Measuring LN2 reservoir) in the google docs and sheets above can not be installed not (waiting pipe/line installation). The rest could be installed
- Sensors number 10 and 11 are LANL sensors. Please consult Misha to make sure which are the correct sensors since in the root, there are several other sensors from oerlikon
- Please consult Ernesto for the current location of sensors and long cables
9 | Pfeiffer PKR 361 | 1 | Attached to dewar | Pfeiffer TPG 361 | Slow-control rack | Target computer | |
8 | MKS 722B #1 | 1 | Return manifold | MKS 946 #1, ch. 1 | Slow-control rack | Target computer | |
5 | MKS 722B #2 | 1 | Main return line, after roots pump | MKS 946 #1, ch. 2 | ditto | ditto | |
1 | MKS 690 #1 (100 Torr) | 1 | Fridge via flex hose | MKS 670 #1 | Slow-control rack | Target computer | |
2 | MKS 690 #2 (1000 Torr) | 1 | Neat MKS 690 100 Torr | MKS 670 #2 | Slow-control rack | Target computer | |
3 | MKS 615 | 1 | He3 pressure probe | MKS 670 #3 | Slow-control rack | Target computer | |
6 | Pfeiffer TPR280 | 1 | Separator return line, near return manifold | Maxigauge # 1, ch. 3 | Magnet Rack | Target computer | To be replaced with APR250 |
7 | Pfeiffer TPR280 | 1 | Magnet return line, near return manifold | Maxigauge # 1, ch. 4 | Magnet Rack | Target computer | To be replaced with APR250 |
x | Pfeiffer APR250 | 1 | Main return line, near return manifold | Maxigauge # 1, ch. 5 | Magnet Rack | Target computer | To be replaced with another sensor |
10 | Pfeiffer TPR280 | 1 | Roots pump, LANL | Maxigauge # 1, ch. 1 | Magnet Rack | Target computer | |
11 | Pfeiffer TPR280 | 1 | Roots pump, LANL | Maxigauge # 1, ch. 2 | Magnet Rack | Target computer |
Temperature Sensor
- Drawing about sensor locations: https://docs.google.com/drawings/d/1GqKY_9TjaVcJRM2lM2pf_QPTJEXJiqYSX4lqnYAeNM0/edit
- For the annealing system we should have the analogue setup be entirely independent of the other system, this will require 4 sensors. Two for the Waqar system and 2 for the Henery system, if possible.
- All other, ~20 sensors should be setup with the same type of DAQ that Kenichi is testing unless we determine it is not suitable regarding temperature dependent error. The error budgets are different for several of these, but Magnet coils is by far the most critical low relative error requirement. So, if it looks like this setup will work there it will work everywhere.
Vishay Chip 1K OHM | 8 | Inside of Fridge | No | Not sure | LakeShore 218 #1 | Slow-control rack | Yes? | Target computer | |
6 Vishay Chip 1 K OHM + 2 cernox | 8 | Target Insert | no | Not sure | LakeShore 218 #2 | Slow-control rack | Yes? | Target computer | |
Type-T TC | 8 | Magnet coils | Yes | Yes | MCC E-TC #1 | Slow-control rack | Yes | Target computer | |
Type-T TC | 3 | LHe QT fill line (2 vacuum layer, 1 on stinger) | Yes | Yes | MCC E-TC #2 | Slow-control rack | Yes | Target computer | |
Type-T TC | 2 | Magnet IVC | Yes | Yes | MCC E-TC #2 | ditto | ditto | ditto | |
Type-T TC | 1 | Separator line | Yes | Yes | MCC E-TC #2 | ditto | ditto | ditto | |
Type-T TC | 1 | Top seal of fridge | Yes | Yes | MCC E-TC #2 | ditto | ditto | ditto | |
Type-T TC | 2 | Microwave cooling (1 on EIO, 1 on cooling water) | Yes | Yes | MCC E-TC #3 | Slow-control rack | Yes | Target computer | |
Type-T TC | 2 | Fridge for Waqar's manual annealing system | Yes | Yes | MCC E-TC #3 | ditto | ditto | ditto | |
Type-T TC | 2 | Fridge for Henery's automated annealing system | No | No | Arduino?? | Annealing Panel | No | ?? | |
Type-K TC | 10 | Surface of 10 cold heads | Yes | Yes | LabJack U3-LV | Slow-control rack | Yes | Target computer | |