You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

  1. Check the magnet current. If it is not 74.51A, or already ramped-down, then go to step #2.
    If the current is 74.51A, then change it to 74A by following How to move the magnet current procedure.

  2. On NMR Terminal, click "NMR Tune".
  3. Click the box next to the label "Baseline"; and a new window will be opened.
  4. Click "Create a new Baseline", then this new window will be automatically closed.
  5. Change the number of sweeps to 5000.
  6. Then Click "One Point" button, it will take about ~320 seconds for a 5000 sweeps baseline.
  7. Wait until the indicator (RED) goes to "Pause" after taking the baseline.
  8. Click "New Baseline" button (to select the baseline that you just took), then it will open a new window).

  9. Select the Baseline from drop-down list on the left (use the time-stamp to select the correct one), and press the "Selected Highlighted Baseline"; then the window will be closed automatically.
  10. Change the number of sweeps to 100.
  11. Click "Take Data".



If you want to create a new "event" file (for example: to take TE measurement), follow the steps on How to create a new event file on PDP

  • No labels