We sometimes need to (nearly) empty the fridge in a short time, for example;
- To load/unload the target insert, and
- To consume LHe in the fridge and/or the magnet fast.
Conditions
- You have been trained by an experienced person on this procedure.
- The nose LHe level is above 80%. If it is below 80%, this method cannot evaporate LHe effectively, and thus you should simply wait until LHe evaporates by itself.
- The heat tape for the turret is in operation.
- About the roots pump, the rotary vane pump (SV630BF) is ON and the boosters (WH7000-1, 2 & 3) are OFF.
- The gate-valve bypass is fully opened (at 0.25 turns).
- On Fridge_Valve_Main.vi;
- The mode of the level probe is "CONT" (not "HOLD").
- The Interlock with Heat-Ex Top is enabled.
- The "Voltage" knob of the Annealing Plate Control Box is fully rotated clockwise.
Procedure
- Turn ON the "Power Control" switch of the Annealing Plate Control Box, and turn it OFF when the top-section pressure of the roots pump reaches 10 Torr.
- Never leave the switch ON longer than required in this and later steps.
- You had better keep your finger on the switch, not to forget turning it OFF.
- Confirm that the main return flow increases to 100-150 SLM. If it is higher/lower, find any difference in the conditions.
- Turn ON the "Power Control" switch, and turn it OFF when the top-section pressure reaches 16 Torr.
- Confirm that the main return flow increases to 150-250 SLM. If it is higher/lower, find any difference in the conditions.
- Wait until the top-section pressure decreases to 8 Torr (or below).
- Repeat steps 3-5 until the nose LHe level becomes ~80%.
- x
Change the separator flow to 20 SLM (from 7 SLM usually).
- Wait for 1.5 hours _if_ the nose LHe level is below 0% (i.e. warm). If not, you need not wait.
- Change the separator flow to 25 SLM.
Open the fridge bypass valve at 2.0 turns. Confirm that the fridge return flow goes up.
- Open the bypass valve at 3.0 turns.
- Change the separator flow to 30 SLM.
Wait until the Ann-Plate Top resistor goes up to 1400 Ohm, which indicates that the liquid started accumulating. It usually takes 30 minutes from step #3. If it takes longer than 40 minutes, search for unexpected conditions.
- Wait until the nose LHe level reaches 100%. It usually takes 15 minutes from the previous step.
- Wait until the Heat-Ex Bottom resistor goes down from 1400 Ohm and then up. It usually takes 10 minutes from the previous step.
Wait until the Heat-Ex Top resistor goes up to 1400 Ohm, which indicates that the liquid is as high as Heat-Ex Top. It usually takes 10 minutes from the previous step.
Close the bypass valve.
- Usually the software interlock sets it at 0.5 turns automatically.
- Anyway you set it at 0.0 turns manually.
Change the separator flow to 7 SLM.
- Change the setting of the gate-valve bypass as follows:
- The set point for the auto control is 40 Torr.
- The auto control is enabled.
- Change the level-probe mode back to "HOLD" if you changed it in step 5.