This page is to collect all information about the Slow Controls system. Old information is saved in this sub page.
Turn-Off/On Procedure
Procedure for turning off and on the slow control rack, in case of planned/unplanned power outage.
Turning Off
- Make sure all programs about the slow controls (running on the target computer) are stopped.
- Record which devices are on (and off).
- Turn off all devices that have a mechanical power switch.
- This step might not be necessary since the power cords are unplugged in the next step and thus any surge current during a power outage recovery should not come in. We need discuss to decide.
- Unplug the two power cords of the slow control rack.
Turning On
- Plug the two power cords of the slow control rack.
- Turn on all devices that have a mechanical power switch.
- Activate TPG 361 by pressing the "up" button for 5 seconds, until the pressure reading of channel 1 is shown.
- Wait until the pressure of TPG 361 goes below 1e-3 Torr. — Is the value correct??
- Activate DCU 600, by pressing the rightmost button. — Is the button correct??
Trouble Shooting
n/a
Expert Alarm
Two types of alarm systems for the target group (not the shifter) are available at present.
1. Regular Passive Alarm with Messaging
- A message is posted on Discord channel "target-alarms". E-mail is possible also.
- Variables and their alarm limits are listed below.
Subsystem | Variable | Unit | LOLO | LO | HI | HIHI | Enabled? | Note |
---|---|---|---|---|---|---|---|---|
Cryo Control Panel | IVC Pressure | Torr | n/a | n/a | 1e-6 | 1e-5 | No | |
Roots-Pump LCW | W1/W2/W3 | GPM | 0.2 | 0.3 | n/a | n/a | Yes | |
FSW1 | GPM | 1.2 | 1.3 | n/a | n/a | Yes | ||
QT HMI | Liq-A/B LHe level | L | ?? | ?? | 180 | 200 | No | |
PT8 | psi | 30? | 40? | 100? | 110? | No | ||
Purifier LN2 level | L | 40 | 50 | 85 | 95 | No | ||
Last Updated: | 2022-Nov-22 11:06 |
2. Special Active Alarm with Audio+Color
- "Alarm" in E1039 Data Summary: https://e906-gat1.fnal.gov/data-summary/e1039/target-par-alarm.php
- Useful in closely monitoring changes of variables, during cool down for example.
- Variables and their alarm limits are given in the page itself. To add variables or change the default alarm limits, please ask Kenichi.
Software
- Git repository: https://github.com/uva-spin
- Old ones: https://github.com/UVA-LabVIEW-Projects/LabVIEW-Projects & https://github.com/E1039-Collaboration/e1039-target-controls
Device List
Flow
- Drawing about sensor locations: https://docs.google.com/drawings/d/1tOOoeUHOlIiYZZEKrPSB4e7GuGj3c78bpsnPMUKvgos/edit
Sensor Device | N | Sensor Location | Controller Device | Controller Location | Front End | Notes |
---|---|---|---|---|---|---|
TH HFC-303 | 2 | Magnet & Separator | THCD-400 #1 | Slow-control rack | CCP @ Target computer | |
TH HFM-305 | 1 | Fridge | THCD-400 #1 | ditto | CCP @ Target computer | |
??? | 5 | roots LCW inflow | Arduino | Magnet rack | Target computer | Photo wanted. |
??? | 1 | NM4 LCW inflow | ACNET | n/a | Target computer?? | Photo |
Pressure
- The table below is for a summary. For a more complete pressure information please visit: https://docs.google.com/spreadsheets/d/1Dh6Y27IiEedgq5waZs8_9CsKKFSGWBRfoOAU4PYjFwM/edit?usp=sharing
- Drawing about sensor locations: https://docs.google.com/drawings/d/16cCaIn4SXTD8Wq2xzqePSZeJITV-1SPnE9UjyXzBx5w/edit
Note about installation:
- The biggest issue is where to put MKS 690 1000 Torr. Ideally it should be close to the 100 Torr one
- Please consult with Dustin to make sure about the final location
- Sensor number 3 (He3) and 8 (Measuring LN2 reservoir) in the google docs and sheets above can not be installed not (waiting pipe/line installation). The rest could be installed
- Sensors number 10 and 11 are LANL sensors. Please consult Misha to make sure which are the correct sensors since in the root, there are several other sensors from oerlikon
- Please consult Ernesto for the current location of sensors and long cables
Item number | Sensor Device | N | Sensor Location | Controller Device | Controller Location | Front End | Note |
---|---|---|---|---|---|---|---|
9 | Pfeiffer PKR 361 | 1 | Attached to dewar | Pfeiffer TPG 361 | Slow-control rack | Target computer | |
8 | MKS 722B #1 | 1 | Return manifold | MKS 946 #1, ch. 1 | Slow-control rack | Target computer | |
5 | MKS 722B #2 | 1 | Main return line, after roots pump | MKS 946 #1, ch. 2 | ditto | ditto | |
1 | MKS 690 #1 (100 Torr) | 1 | Fridge via flex hose | MKS 670 #1 | Slow-control rack | Target computer | |
2 | MKS 690 #2 (1000 Torr) | 1 | Neat MKS 690 100 Torr | MKS 670 #2 | Slow-control rack | Target computer | |
3 | MKS 615 | 1 | He3 pressure probe | MKS 670 #3 | Slow-control rack | Target computer | |
6 | Pfeiffer TPR280 | 1 | Separator return line, near return manifold | Maxigauge # 1, ch. 3 | Magnet Rack | Target computer | To be replaced with APR250 |
7 | Pfeiffer TPR280 | 1 | Magnet return line, near return manifold | Maxigauge # 1, ch. 4 | Magnet Rack | Target computer | To be replaced with APR250 |
x | Pfeiffer APR250 | 1 | Main return line, near return manifold | Maxigauge # 1, ch. 5 | Magnet Rack | Target computer | To be replaced with another sensor |
10 | Pfeiffer TPR280 | 1 | Roots pump, LANL | Maxigauge # 1, ch. 1 | Magnet Rack | Target computer | |
11 | Pfeiffer TPR280 | 1 | Roots pump, LANL | Maxigauge # 1, ch. 2 | Magnet Rack | Target computer |
Item | Location | Notes |
---|---|---|
9 | Already installed | |
8 | Pipe fitting: KF-40 Sensor fitting: 4-VCR Female Flex hose (needed because the gas port of the sensor must not be directed upward) KF40 to KF16 converter : https://locoscience.com/products/kf40-to-kf16-flanges-vacuum-fitting-conical-reducer-adapter KF16 flex hose: https://locoscience.com/products/kf16-flexible-vacuum-bellow-1000mm?_pos=1&_sid=63838aa66&_ss=r | |
5 | Pipe fitting: KF-16 Sensor fitting: 4-VCR Female Adapter: KF-16 to 4-VCR Male https://www.idealvac.com/Adapter-KF-16-to-4-VCR-Male/pp/P101374 Location: towards upside of the white piping (see the left image) | |
1 & 2 | Pipe fitting: 1000Torr (~ $ 470) KF16 to 1/2" swagelok | |
3 | This is He Vapor pressure sensor (MKS 615) | Waiting for piping |
6 & 7 | 6) Separator line from cave should be connected to: Tee: https://locoscience.com/products/3-way-tee-kf25-flange-vacuum-fitting 7) LHe vapor line from Magnet Dewar should be connected to: Adapter: https://locoscience.com/products/kf25-flange-to-1-npt-male-vacuum-fitting-adapter flex hose: https://www.amazon.com/ISO-KF-Corrugated-Bellow-Aluminum-Centering/dp/B09QGWGM2W (Qty 4) Also, need a count of various converters we already have. | |
Fermilab Tech will help us install this one | ||
10 & 11 | LANL sensors. Check with Misha | |
4 (AUX) | MKS 722B (cylinder silver) seen in the photo has been moved to the roots pump area for #5. TPR 280 will be place for #4 (AUX). We need a longer cable. |
Temperature
- Drawing about sensor locations: https://docs.google.com/drawings/d/1GqKY_9TjaVcJRM2lM2pf_QPTJEXJiqYSX4lqnYAeNM0/edit
- For the annealing system we should have the analogue setup be entirely independent of the other system, this will require 4 sensors. Two for the Waqar system and 2 for the Henery system, if possible.
- All other, ~20 sensors should be setup with the same type of DAQ that Kenichi is testing unless we determine it is not suitable regarding temperature dependent error. The error budgets are different for several of these, but Magnet coils is by far the most critical low relative error requirement. So, if it looks like this setup will work there it will work everywhere.
Sensor Device | N | Sensor Location | Sensor in place | Cable in place | Controller Device | Controller Location | Controller in place | Front End | Notes |
---|---|---|---|---|---|---|---|---|---|
Vishay Chip 1K OHM | 8 | Inside of Fridge | No | Not sure | LakeShore 218 #1 | Slow-control rack | Yes? | Target computer | |
6 Vishay Chip 1 K OHM + 2 cernox | 8 | Target Insert | no | Not sure | LakeShore 218 #2 | Slow-control rack | Yes? | Target computer | |
Type-T TC | 8 | Magnet coils | Yes | Yes | MCC E-TC #1 | Slow-control rack | Yes | Target computer | |
Type-T TC | 3 | LHe QT fill line (2 vacuum layer, 1 on stinger) | Yes | Yes | MCC E-TC #2 | Slow-control rack | Yes | Target computer | |
Type-T TC | 2 | Magnet IVC | Yes | Yes | MCC E-TC #2 | ditto | ditto | ditto | |
Type-T TC | 1 | Separator line | Yes | Yes | MCC E-TC #2 | ditto | ditto | ditto | |
Type-T TC | 1 | Top seal of fridge | Yes | Yes | MCC E-TC #2 | ditto | ditto | ditto | |
Type-T TC | 2 | Microwave cooling (1 on EIO, 1 on cooling water) | Yes | Yes | MCC E-TC #3 | Slow-control rack | Yes | Target computer | |
Type-T TC | 2 | Fridge for Waqar's manual annealing system | Yes | Yes | MCC E-TC #3 | ditto | ditto | ditto | |
Type-T TC | 2 | Fridge for Henery's automated annealing system | No | No | Arduino?? | Annealing Panel | No | ?? | |
Type-K TC | 10 | Surface of 10 cold heads | Yes | Yes | LabJack U3-LV | Slow-control rack | Yes | Target computer | |
Cryo Control Panel: CCP
- Repository: https://github.com/uva-spin/e1039-target-controls/tree/master/Cryo-Control
- The latest version should be found in a development branch.
- Conditions of devices & VIs expected for the FNAL review in early April?
- Focus on the basic readouts and controls, given the time frame (10 days).
- The expected condition of each device is proposed in the table below.
- Functions not expected?
- Automated control
- Readout logging
- Warning system
List of devices to be included
Controller Sensor Interface Controller+sensor ready? Standalone VIs ready? VIs integrated into CCP? Condition for FNAL Review? THCD 400 2 x HFC + HFM RS-232 Yes Yes Yes - Auto-read the three sensors at 1 Hz.
- Change the set point of two HFCs manually.
AMI 1700 LHe4 level probe RS-232 Yes n/a Yes - Auto-read the He level at 1 Hz.
Run valve Motor driver: AM ST5-S
ADC: MCC USB-202
RS-232
USB
Yes
Yes
n/a Yes - Auto-read the motor position at 1 Hz.
- Move the motor manually.
Bypass valve Motor driver: AM ST5-S
ADC: MCC USB-202
RS-232
USB
Yes
Yes
n/a Yes - Same as the run valve.
MKS 670 MKS 690 (100 Torr) GPIB Yes+No (*2) n/a Yes - Auto-read the sensor at 1 Hz (w/o sensor).
MKS 670 MKS 690 (1000 Torr) RS-232 Yes Yes Yes - Auto-read the sensor at 1 Hz.
MKS 670 MKS 615 GPIB Yes+No (*3) n/a Yes - Auto-read the sensor at 1 Hz (w/o sensor).
MKS 946 2 x MKS 722 RS-232 Yes Yes Yes - Auto-read the two sensors at 1 Hz.
MaxiGauge 5 x Pfeiffer Vacuum TPR 280 RS-232? Yes Yes Yes - Auto-read the five sensors at 1 Hz.
- The readiness in the table considers the development of CCP, not the final configuration for the commissioning and data taking.
- *2: A long cable is needed. Waqar plans to make it soon.
- *3: Where should we place MKS 615 (the blus box)? The present cable from MKS 615 to the probe is of 1 m, which seems too short in terms of the radiation damage. Longer cable are needed accordingly.
Slow Control Rack + Magnet Rack Readiness Checklist:
This is table contain the status of the slow control rack and magnet rack: RackStatusApril2022.xlsx
Some (Not all) priority:
- Test the VI for the Lakeshore
- Install remaining pressure sensors (See the table above about pressure sensor list)
- Install remaining Temperature sensors and readout (See the table above)
- Install the He and N2 Level probe connected to AMI1700
- Fixing the VI for MaxiGauge and Flow meter LCW
- Fix the Shim power supply relay
- Test the new AMI1700, the VI and the Voltage current converter box
Meeting Materials
Date | Title | Presenter | File |
---|---|---|---|
| VIs for MCC E-TC | Kenichi | labview_20210810.pdf |
| Update on LN2 Bos | Vibodha | SCMeetig_August25.pptx |
| Zulkaida | ||
| Step count ADC length relationship | Vibodha | |
| Updates on slow control rack and target computer | Kenichi | labview_20210915.pdf |
| MKS 670 + PDP and LakeShore 218 + GPIB | Kenichi | labview_20210922.pdf |
| VIs for MCC E-TC | Kenichi | labview_20210929.pdf |
| VIs for MCC E-TC | Kenichi | labview_20211013.pdf |
| Lifter Vi update | Vibodha | |
| MCC E-TC & Slow Control Data Monitor | Kenichi | labview_20211103.pdf |
| Slow Control Data Monitor & MCC USB-202 | Kenichi | labview_20211110.pdf |
| Slow Control Data Monitor & MCC E-TC with long TC | Kenichi | labview_20211117.pdf |
| Some list about pressure sensor | Zulkaida | |
| Slow Control Data Monitor, NMR Computer & MCC USB-202 with TC | Kenichi | labview_20211124.pdf |
| NMR computer & MKS 615 | Kenichi | labview_20211201.pdf |
| Lifter VI | Vibodha | |
| Slow-Control System, NMR Computer & MKS 615 | Kenichi | labview_20211208.pdf |
| Test of MKS 615 with LN2 Test of MCC E-TC + Long TC in LN2 | Kenichi Kenichi | |
| TCP/IP communication of spill info, N of sweeps/measurement on PDP | Kenichi | slow_cont_20220119.pdf |
| PDP Readout Test | Kenichi | slow_cont_20220126.pdf |
| TCs for magnet coils and others; Rearrangement of KF connection | Kenichi | slow_cont_20220216.pdf |
| Cryo Control Panel | Kenichi | slow_cont_20220302.pdf |
| TCs for magnet coils; Cryo Control Panel | Kenichi | |
| Cryo Control Panel | Kenichi | |
| Cryo Control Panel | Kenichi | |
| Run+Bypass Valve in CCP | Kenichi | |
| MKS670 and MaxiGauge in CCP | Kenichi | |
| LCW flow meter, TC, CCP | Kenichi | |
| Measurement of NMR noise level Logging, Automated alarm | Kenichi Kenichi | |
| QT HMI | Kenichi | |
| QT HMI, Chart-axis control | Kenichi | |
| TCs; Cables for MKS 615 | Kenichi | |
| Magnet PS Shim Relay | Kenichi | |
| Logging of roots-pump PLC; Pressure-sensor locations | Kenichi |