You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Current »

Each TO during the Swing shift needs to make sure of the following things:

  1. Calculate the Consumption rate, Production rate, and Magnet Seam level using the following PHP script. 

Please see the link to the PHP script: Combined Calculators (fnal.gov)


Please see the link to the PHP script Combined Calculators (fnal.gov) to see the Magnet Seam Level and arrange a Magnet fill the next day during the Morning Shift. 


  1. Calculate the LHe loss using the following Python script. 



  • No labels