Please go through all these valve settings before starting the system to liquefy.
Location | Valve / Parameter | Position / Value |
---|---|---|
Outside gHe tank | MV107 | Open |
MV108 | Open | |
HR3 | MV101 | Open |
MV102 | Open | |
MV103 | Close | |
L7B (to the Buffer Tank) | Open | |
Vliq1 | Open | |
V19 | Close | |
Vliq2 | Close | |
V18 | This is a 3-way hand valve: position→ gas flow downwards | |
VEVAC | Close | |
V30 | Open | |
V35 | Open | |
VP | Close | |
V36 | Close | |
REGP | Open (fully) | |
V11 | Open | |
Vs4 | Close | |
Vfill | Close | |
Vmup | Close | |
V17 | Close | |
V14 | Open | |
NV2 | Close | |
SVPD | Always open (relay was taken out) | |
V12 | Close | |
V13 | Close | |
VDepr | Close | |
FI01 | Completely Open | |
FI02 | Open (somewhere in the middle) | |
FI03 | Completely Close | |