You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Please go through all these valve settings before starting the system to liquefy.


LocationValve / ParameterPosition / Value
Outside gHe tankMV107Open

MV108Open
HR3MV101Open

MV102Open

MV103Close

L7B (to the Buffer Tank)Open

Vliq1Open

V19Close

Vliq2Close

V18This is a 3-way hand valve: position→ gas flow downwards

VEVACClose

V30Open

V35Open

VPClose

V36Close

REGPOpen (fully)

V11Open

Vs4Close

VfillClose

VmupClose

V17Close

V14Open

NV2Close

SVPDAlways open (relay was taken out)

V12Close

V13Close

VDeprClose

FI01Completely Open

FI02Open (somewhere in the middle)

FI03Completely Close




  • No labels