The original reference to this table is https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=9164
N | ORC-ID # | Title | Submitted | Reviewed | Approved | Div. Signed | Who | Notes | |||
1 | 1834 | E1039 Microwave Test Stand | 1 | 1 | 1 | 1 | W.Ahmed | High Voltage | |||
1834.01 | E1039 Microwave Test Stand | deprecated? | Gases | ||||||||
1834.02 | E1039 Microwave Test Stand (new control box) | deprecated? | Hazardous Chemicals | ||||||||
2 | 1837 | E1039 Target Lifter System | 1 | 1 | 1 | 1 | V.Bandara | Custom Electronics | |||
1837.01 | E1039 Target Lifter Addendum (re-installation) | 1 | 1 | 1 | 1 | V.Bandara | Re-installation of the lifter in the target cave | Mechanical Structures | |||
3 | 1847 | E1039 Roots Vacuum | 1 | 1 | 1 | 1 | A.Arora | Electrical Equipment | |||
1847.03 | E1039 addendum to ORC-1847 for gHe recovery piping | 1 | 1 | 1 | 1 | includes roots exhaust | Cryogenics | ||||
4 | 1853 | E1039 Magnet Power Supply Rack | 1 | 1 | 1 | 1 | W.Ahmed | Vacuum Vessels and piping, Vacuum Window | |||
5 | 1854 | E1039 NMR system part 1 (custom electronics) | 1 | 1 | 1 | 1 | I. Fernando | Pressure Vessels and piping | |||
6 | 1857 | E1039 Liquefaction Electrical System | 1 | 1 | 1 | 1 | W.Ahmed | ||||
1857.01 | E1039 Liquefaction Electrical System | 1 | 1 | 1 | 1 | W.Ahmed | Small PLC cabinet on west wall | ||||
7 | 1865 | E1039 Target Lifter Control System | 1 | 1 | 1 | 1 | V.Bandara | ||||
8 | 1866 | E1039 Target Lifter ADC System | 1 | 1 | 1 | 1 | V.Bandara | ||||
9 | 1867 | E1039 AC power dist for slow controls rack | 1 | 1 | 1 | 1 | S.Chappa | ||||
10 | 1877 | E1039 Target lifter monitor | 1 | 1 | 1 | 1 | V.Bandera | ||||
11 | 1888 | E1039 NMR system part 2 (commercial components) | 1 | 1 | 1 | 1 | I.Fernando | ||||
12 | 1888.01 | E1039 NMR addendum | 1 | 1 | 1 | 1 | I.Fernando | ||||
13 | 1895 | E1039 Slow controls rack for the SpinQuest experiment | 1 | 1 | 1 | 1 | Z.Akbar | ||||
14 | 1933 | E1039 NMR rack quiet AC power | 1 | 1 | 1 | 1 | S.Chappa/RJT | ||||
15 | 1934 | E1039 Microwave motor controlling system (exp. Hall) | 1 | 1 | 1 | 1 | V.Bandara | ||||
16 | 1938 | E1039 Helium Liquefaction plant | 1 | 1 | 1 | 1 | RJT/D.Keller | ||||
17 | 1941 | E1039 ODH & Hazardous Gas Controls | 1 | 1 | 1 | 1 | K.Overhage | ||||
18 | 1954 | Spinquest (E1039) Fridge valve controlling system | 1 | 1 | 1 | 1 | V.Bandara | ||||
19 | 1968 | E1039 Microwave test setup at counting hall | 1 | 1 | 1 | 1 | W.Ahmed | ||||
20 | 1969 | E1039 Microwave setup in Hall | 1 | 1 | 1 | 1 | W.Ahmed | ||||
1969.01 | E1039 Microwave setup in Hall (reinstall) | 1 | 1 | 1 | 1 | V.Bandara | Re-ORC after disassembly | ||||
21 | 1970 | E1039 Annealing system at Hall (slow controls rack) | 1 | 1 | 1 | 1 | W.Ahmed | examine all 1970 docs. | |||
1970.01 | E1039 Annealing system (Roots gate valve control box) | 1 | 1 | 1 | 1 | W.Ahmed | |||||
22 | 1982 | E1039 Magnet Power supply rack update | 1 | 1 | 1 | 1 | W. Ahmed | ||||
1982.01 | E1039 Helium level addendum to ORC-1982 | 1 | 1 | 1 | 1 | W. Ahmed | |||||
23 | 1983 | E1039 Update Roots vacuum | 1 | 1 | 1 | 1 | W. Ahmed | ||||
24 | 1984 | E1039 VME based NMR system (LANL) | 1 | 1 | 1 | 1 | W. Ahmed | ||||
1984.01 | E1039 VME based NMR system Addendum (LANL) | 1 | 1 | 1 | 1 | M.Yurov | |||||
26 | 2002 | E1039 LN2 delivery and gN2 vent piping | 1 | 1 | 1 | 1 | J.Kintner/RJT | ||||
27 | 2008 | E1039 Liquid Helium transfer and cooldown piping | 1 | 1 | 1 | 1 | J.Kintner/RJT | ||||
25 | 2046 | E1039 NM4 ODH Controls | 1 | 1 | 1 | 1 | K.Overhage | ||||
28 | 2049 | E1039 Target Magnet (electronics) | 1 | 1 | 1 | 1 | I.Fernando | ||||
29 | 2050 | E1039 Target Fridge (electronics) | 1 | 1 | 1 | 1 | K.Nakano | ||||
30 | 2053 | E1039 Target cave Helium, nitrogen piping | 1 | 1 | 1 | 1 | V.Bandara | ||||
31 | 2056 | Target Magnet (cooldown cryogenics/mechanical) | 1 | 1 | 1 | 1 | I.Fernando | ||||
Target magnet (Fridge addendum) | 1 | 1 | 1 | 1 | |||||||
32 | 2071 | Target Magnet Powerup | 1 | 1 | 1 | 1 | I.Fernando | ||||
34 | 2137 | E1039 Target Gate Valve bypass valve control box | 1 | 1 | 1 | 1 | V.Bandara | ||||
35 | 2162 | Polarized target insert (electronics & microwave) | 1 | 1 | 1 | 1 | I.Fernando | Delegated to E.Niner | |||
36 | 2167 | 2nd Microwave control box (for test stand) | 1 | 1 | 1 | 1 | V.Bandara | ||||
37 | 2171 | Heat Tape for target cryostat | 1 | 1 | 1 | 1 | K.Nakano | ||||
38 | 2186 | NMR Test Stand | 1 | 1 | 1 | 1 | A.Pattividana | L.Reger | |||
39 | 2199 | Outdoor gHe tank pressure/temp sensors & readout | 1 | 1 | 1 | 1 | K.Nakano | ||||
40 | 2201 | Magnet gHe flow controller bypass control electronics | 1 | 1 | 1 | 1 | V.Bandara | ||||
41 | 2205 | Temperature sensors for cryo-compressor water system | 1 | 1 | 1 | 1 | K.Nakano | ||||
42 | 2213 | UVa NMR 3 channel box (test stand) | 1 | 1 | 1 | 1 | A.Pattividana | ||||
43 | 2164 | Final beam ORC for the experiment | R.Tesarek | ||||||||
44 | |||||||||||
Total | 196 |