ORC - Post what you have NOW (inform Rick and get feedback)
0.25" Stainless steel tubing for penetration through penetration for Gas Bottle He with PETE on either side
Connect vacuum piping and turbopump (leave pneumatic valve out)
Chiller placed at the corner I pointed out with hard plastic tubing to connect microwave water
Racks populated with Carlos list of devices then put racks in place on cryo-platform:
control box/Interlock
microwave water monitor
actuator table readback
Find any remaining custom electronics
cable trays for target control system on cryo-platform
cable trays for target magnet rack
Later we need:
Target Controls (designated person)
- sensors
- readouts
- actuator
- cryocontrols
- monitor/alarms
Liquefier (designated person)
- controls
- sensors
- monitor/alarms
Counting House Connections
- pass all cables in