Based on the FNAL "Approved" procedure on https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10355
Demonstrational Video (Note: Please ignore the Steps with the "Iron Cage" as it was replaced with a storage cabinet in the very recent approved-version):
https://drive.google.com/file/d/18QMZcQo55Yr2iqhSTFtNA3yn9LO8JOMZ/view?usp=sharing


Checklist for Unloading the insert without NH3/ND3

Item #LocationCheck Item
1Control room areaNotify the Target Expert, the run coordinator, and the FNAL RCT team
Is the FNAL RCT team available to access the cave with you? Discuss the work plan with everyone going to make the access.
Pickup NM3 and NM4 keys
2Control room areaClose the Gate Valve (GV), and the GV-Bypass valve
3Control room areaEnsure the target lifter is in the bottom position
4Control room areaPPE:
Cryo-gloves
PPE level 3 (Tyvex suit, gloves, shoe covers)
5Control room areaEnsure that the TO has a walkie-talkie to communicate and stay in the control room to monitor the system
6Control room areaHave you had a job briefing with everyone in the access team?
7Material handling stationAre the cart, collar+screws, insert-handle, and two nuts for the insert-handle ready?
8Material handling stationDo you have the wrench to disconnect the microwave? and also a 3/16 wrench in case NMR connectors are tight?
There should be a plastic bag (which contains those tools) hanging on the cart.
9On the way to NM3

Turn ON the ODH fans
OPEN the backfill gHe supply line (+ regulator to 4 psi + the valve D) on the cryoplatform
Turn ON the lights in the cave

10In-cave (before unloading)OPEN the two hand valves on the backfill panel to backfill the fridge. Ensure the pressure gauge is increasing to 0 psig (atmospheric pressure).
Confirm the gHe flow coming out from the 0.5 psig relief valve with your hand.
11In-cave (before unloading)Do you have a banc-off flange, and an extra seal ready?
12In-cave (before unloading)Install the insert handle, and connect the hook to the insert's eyebolt.
13In-cave (before unloading)Disconnect the microwave wave-guide and NMR cable(s) and arrange them properly
14In-cave (before unloading)Have you checked the 0.5 psig relief valve's venting?
15In-cave (unloading)Unload the insert from the fridge
16In-cave (after unloading)Properly close the fridge using a banc-off flange and a seal
17In-cave (after unloading)Have you closed the two hand valves on the backfill panel?
Have you confirmed whether the blanc-off and its seal closed the fridge properly?
18On the way back from NM3

Have you turned OFF the lights in the cave?
Have you turned OFF the fan?
Have you CLOSED the backfill gHe supply line (+ the valve D) on the cryoplatform?



Checklist for Loading the insert without NH3/ND3

Item #LocationCheck Item
1Control room area

Notify the Target Expert, the run coordinator, and the FNAL RCT team
Is the FNAL RCT team available to access the cave with you? Discuss the work plan with everyone going to make the access.
Pickup NM3 and NM4 keys

2Control room areaClose the Gate Valve (GV), and the GV-Bypass valve
3Control room areaIs the fridge level below 20%? If not, bring it down below 20% using the annealing heat
4Control room areaEnsure the target lifter is in the bottom position
5Control room area

PPE:
Cryo-gloves
PPE level 3 (Tyvex suit, gloves, shoe covers)

6Control room areaEnsure that the TO has a walkie-talkie to communicate and stay in the control room to monitor the system
7Control room areaHave you had a job briefing with everyone in the access team?
8Material handling stationAre the insert, cart, collar+screws, insert-handle, and two nuts for the insert-handle ready?
9Material handling stationDo you have the wrench to disconnect the microwave? and also a 3/16 wrench in case NMR connectors are tight?
There should be a plastic bag (which contains those tools) hanging on the cart.
10On the way to NM3

Turn ON the ODH fans
OPEN the backfill gHe supply line (+ regulator to 4 psi + the valve D) on the cryoplatform
Turn ON the lights in the cave

11On the way to NM3Have you installed the insert handle, and connected the hook to the insert's eyebolt?
12In-cave (before loading)

OPEN the two hand valves on the backfill panel to backfill the fridge. Ensure the pressure gauge is increasing to 0 psig (atmospheric pressure).
Confirm the gHe flow coming out from the 0.5 psig relief valve with your hand.

13In-cave (before loading)Do you have an extra seal ready?
14In-cave (before loading)Have you checked the 0.5 psig relief valve's venting?
15In-cave (before loading)Open the fridge banc-off flange and take off the seal.
16In-cave (loading)Load the insert
17In-cave (after loading)Have you closed the two hand valves on the backfill panel?
Have you confirmed whether the insert-top with the seal closed the fridge properly?
18On the way back from NM3

Have you turned OFF the lights in the cave?
Have you turned OFF the fan?
Have you CLOSED the backfill gHe supply line (+ the valve D) on the cryoplatform?




Checklist for Unloading the with NH3/ND3

Item #LocationCheck Item
1Control room areaNotify the Target Expert, the run coordinator, and the FNAL RCT team
Is the FNAL RCT team available to access the cave with you? Discuss the work plan with everyone going to make the access.
Pickup NM3 and NM4 keys

Control room areaFill the LN2 tub, and blue transport dewar, and have some LN2 in the portable handheld dewar at the material handling station
2Control room areaClose the Gate Valve (GV), and the GV-Bypass valve
3Control room areaEnsure the target lifter is in the bottom position
4Control room areaPPE:
Cryo-gloves
PPE level 3 (Tyvex suit, gloves, shoe covers)
5Control room areaEnsure that the TO has a walkie-talkie to communicate and stay in the control room to monitor the system
6Control room areaHave you had a job briefing with everyone in the access team?
7Material handling stationEnsure the following things are ready
cart
collar+screws
insert-handle and two nuts
insert-handle
blue transport dewar with LN2
8Material handling stationDo you have the wrench to disconnect the microwave? and also a 3/16 wrench in case NMR connectors are tight?
There should be a plastic bag (which contains those tools) hanging on the cart.
9On the way to NM3

Turn ON the ODH fans
OPEN the backfill gHe supply line (+ regulator to 4 psi + the valve D) on the cryoplatform
Turn ON the lights in the cave


At NM3

One person should go to the cave while the other person connecting the blue transfer dewar with LN2 to the hook at NM3.
The person in NM3 should wait until the blue transport dewar is taken into the cave by the person in the cave, and then go to the cave.


In-cave (before unloading)

Place the blue transport dewar with LN2 on top of the magnet cryostat so you can quickly submerge the target cups as soon as the insert is taken-out.

10In-cave (before unloading)OPEN the two hand valves on the backfill panel to backfill the fridge. Ensure the pressure gauge is increasing to 0 psig (atmospheric pressure).
Confirm the gHe flow coming out from the 0.5 psig relief valve with your hand.
11In-cave (before unloading)Do you have a banc-off flange, and an extra seal ready?
12In-cave (before unloading)Install the insert handle, and connect the hook to the insert's eyebolt.
13In-cave (before unloading)Disconnect the microwave wave-guide and NMR cable(s) and arrange them properly
14In-cave (before unloading)Have you checked the 0.5 psig relief valve's venting?
15In-cave (unloading)Unload the insert from the fridge and submerge the target cups as soon as the insert is taken-out.
16In-cave (after unloading)Properly close the fridge using a banc-off flange and a seal
17In-cave (after unloading)Have you closed the two hand valves on the backfill panel?
Have you confirmed whether the blanc-off and its seal closed the fridge properly?
18On the way back from NM3

Have you turned OFF the lights in the cave?
Have you turned OFF the fan?
Have you CLOSED the backfill gHe supply line (+ the valve D) on the cryoplatform?



Checklist for Loading the insert without NH3/ND3

Item #LocationCheck Item
1Control room area

Notify the Target Expert, the run coordinator, and the FNAL RCT team
Is the FNAL RCT team available to access the cave with you? Discuss the work plan with everyone going to make the access.
Pickup NM3 and NM4 keys

2Control room areaClose the Gate Valve (GV), and the GV-Bypass valve
3Control room areaIs the fridge level below 20%? If not, bring it down below 20% using the annealing heat
4Control room areaEnsure the target lifter is in the bottom position
5Control room area

PPE:
Cryo-gloves
PPE level 3 (Tyvex suit, gloves, shoe covers)

6Control room areaEnsure that the TO has a walkie-talkie to communicate and stay in the control room to monitor the system
7Control room areaHave you had a job briefing with everyone in the access team?
8Material handling stationAre the insert, cart, collar+screws, insert-handle, and two nuts for the insert-handle ready?
9Material handling stationDo you have the wrench to disconnect the microwave? and also a 3/16 wrench in case NMR connectors are tight?
There should be a plastic bag (which contains those tools) hanging on the cart.
10On the way to NM3

Turn ON the ODH fans
OPEN the backfill gHe supply line (+ regulator to 4 psi + the valve D) on the cryoplatform
Turn ON the lights in the cave

11On the way to NM3Have you installed the insert handle, and connected the hook to the insert's eyebolt?
12In-cave (before loading)

OPEN the two hand valves on the backfill panel to backfill the fridge. Ensure the pressure gauge is increasing to 0 psig (atmospheric pressure).
Confirm the gHe flow coming out from the 0.5 psig relief valve with your hand.

13In-cave (before loading)Do you have an extra seal ready?
14In-cave (before loading)Have you checked the 0.5 psig relief valve's venting?
15In-cave (before loading)Open the fridge banc-off flange and take off the seal.
16In-cave (loading)Load the insert
17In-cave (after loading)Have you closed the two hand valves on the backfill panel?
Have you confirmed whether the insert-top with the seal closed the fridge properly?
18On the way back from NM3

Have you turned OFF the lights in the cave?
Have you turned OFF the fan?
Have you CLOSED the backfill gHe supply line (+ the valve D) on the cryoplatform?










  • No labels