The subunits of the lifter system

  1. Lifter mechanical setup (in the target cave)
  2. Lifter control box (Slow controls rack)
  3. Lifter ADC Box (Slow controls rack)
  4. Lifter monitoring box (Control room)

Details of each unit

  • Lifter mechanical setup

    QtyDescriptionManufacturerPart number
    7Limit switchHoneywell311SM6-T
    2String Potentiometer TE connectivity PT1A-15-UP-10K-C25
    1stepper motor Applied Motion Products, Inc.HT23-600
    2Right-Angle Gear DriveAndantex USA
    2Screw JackDuff-Norton

After each gearing stage  5000 motor steps = 1" travel 

This is the report prepared by the designer of the lifter   E1039 Target Frame and Lifter Final Report.pdf 

This is the ORC document which covers the electrical wiring in the lifter setup Lifter Electrical ORC.pdf