  1.  Switch the LIquefier to Manual + Liquefy mode (Manual + Idle mode is also the same because Liquefy/Idle option has no effect when it is in the 'Manual' mode)
  2.  Ensure the dewar pressure alarm threshold is around 0.2 psi (navigate to the Liquefier 'Settings' to check that).
  3.  Set the inlet flow to 60slm: enter 60slm on FC501(A/B)Q (then press enter)
  4.  Option 1: Set the outlet flow for the maximum flow by opening SVV(A/B) and the manual hand valve bypassing the SVN(A/B). You will observe the Dewar pressure will drop down to ~0.8psig and get stable.
     Option 2: Open VJV(A/B), VJVT, open Magnet Bypass control valve to have the flow through the magnet. You will observe the Dewar pressure will drop down to ~3.2psig and get stable.
  5.  Option (1):  Open the magic valve NV501A/B completely (~9 turns).
     Option (2): Open SV503(A/B) and keep the magic valve (at ~1/2 a turn)
     (see pictures on Supply Manifold for the Liquefiers)
  6.  Turn ON the cold heads manually on "Helium Compressors" screen
  7.  Move the transfer stinger a few inches up (to avoid touching the bottom).
  8.  It will take about 2 hrs and 30 mins for the cold head temperatures to reach 4 Kelvin.
  9.  Monitor A,B's TI502,TI504, TI506, TI508, TI510 and TIDA/B and you will observe all of them will have a slope towards 4 Kelvin (TIDA/B will be a bit slow compared to coldhead temperatures)
     Note: This is for option (2) cooling via the magnet path.
  10.  Once cold head temperatures reach 4 Kelvin,
    Option (1):  Transition to have the outflow through SNVB (with the flow controller), and stop the flow through  SVVA/B.
                        Close SVVA/B and open SVNA/B and set FCA/BQMC to 60slm.
    Option (2) in the step (4): We can continue to flow gas through the magnet by monitoring the temperature sensors in the magnet as well as in the Dewars.
  11. Once the Dewars are cold, then Close VJVA, Close VJVB, Close VJVT, and open VPC.
  12.  Let/Ensure the Dewar pressures build up to ~6.5 psig on both Dewars.
  13.  Open SVNA/B and set FCA/BQMC to 60slm.
  14.  Let it run in this configuration: in-flow 60slm, out-flow 60slm (via SVNA/B), cold-heads are running, mode: run+manual+liquefy
  15.  You should expect ice/frost on Dewar neck during this phase, and you will have to use the heat gun to melt the frost.
  16.  When you start seeing FCBI start going down while FC501B is 60slm, then lower the value of FCBQMC step by step based on the FCBI.
  17.  Once you bring FCBQMC down < 5slm, then check the Liquefier Settings screen to ensure the following values.
  18.  Switch the Liquefier to Run + Auto + Liquefy mode
  19.  Related to Step #5:
     Option (1): Bring the magic valve position for optimizing for production ( open ~1/2 a turn)
     Option (2): Close SV503 (A/B) and leave the magic valve open ~1/2 a turn (original position)
  20.  When the liquid starts accumulating, move the transfer stinger all the way down.