The subunits of the lifter system
- Lifter mechanical setup (in the target cave)
- Lifter control box (Slow controls rack)
- Lifter ADC Box (Slow controls rack)
- Lifter monitoring box (Control room)
Details of each unit
Lifter mechanical setup
Qty Description Manufacturer Part number 7 Limit switch Honeywell 311SM6-T 2 String Potentiometer TE connectivity PT1A-15-UP-10K-C25 1 stepper motor Applied Motion Products, Inc. HT23-600 2 Right-Angle Gear Drive Andantex USA 2 Screw Jack Duff-Norton
After each gearing stage 5000 motor steps = 1" travel
This is the report prepared by the designer of the lifter E1039 Target Frame and Lifter Final Report.pdf
This is the ORC document which covers the electrical wiring in the lifter setup Lifter Electrical ORC.pdf