Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Status of Run and Bypass valves on CCP. 

Image RemovedImage Added

Click on point 1, "Fridge Valve," in the above picture to open the VI. Points 2 and 3 show the Run and Bypass valve opening at 0.00 turns in the above picture. 

...