Loading the Insert (All target members at Counting House should help organize when this is an ammonia loading job)

StepTime frameLocationPersonnelCritical Points
1Day Before

NM4 Target Loading Area

Cryo-platform 

Target Insert Team

NMR Team

Infrastructure Checks: Make sure insert coils and temperatures sensors are working.  Check that each NMR coil is able to see the crystal signal.  Check the each Cernox is work in LN2.  Make sure each Q-meter is working and each Lambda/2 cable is connected well and you have seen a crystal signal with each prior to target insert installation.  Make sure microwave have been tested and all is ready.
21 hour beforeNM4 Target Loading AreaAny Target Team memberStage the Target Loading: Fill the target loading tub with LN2 at least 60-30 minutes ahead.  It will take 5 trips.  This should be done before calling the RSO, IH, ES&H or anyone else that is coming out to watch.  At this time check that the tools that are needed are laid out on the table, that the microwave and NMR tools are in the little plastic bag on the insert rack, that the insert handle is on the insert, that the screw driver for the lids is there.
3Before going into HallTarget Controls (Counting House)Target ExpertClose gate valve and GV-bypass for backfilling, ensure the fridge is no fuller than 20% otherwise boil it off with the annealing plates, ensure the target actuator position is in Middle position.
4Before going inHall Corridor into NM4Target Loading TeamEnsure PPE for the occasion is used and that you sign the RWP (they check).  Obtain material from shed and bring it down to NM4 and put in LN2 bath ready for loading.
5During ProcedureNM4 Target Loading AreaTarget Loading TeamLoad target.  Take photo of the bottle before loading and bottle label.  After loading take photo of the loaded insert before putting lid on.





Checklist for Unloading the insert without NH3/ND3

...