Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Beginning of shift
    • Arrive at NM4 at least five minutes before the start time of your shift.  Take over the status and the plan of the target system from the outgoing shifter.
    • If the Shift Leader is absent, call MCR (x3721) and say something like "This is <YOUR NAME> at SpinQuest (NM4), and we are starting a new shift."  The MCR person will thank you.
    • If the Shift Leader is absent, complete the "Beginning of Shift" form in the ECL elog.
    • Go through the Target Operator Checklist for the beginning and the end of the shift : ← copy this list and add an ECL elog based on those values.
    • Confirm that the "Active Alarm for Target Operator" page is functioning on "uva-nuc-02", as instructed in this page.
  • Every hour
    • Confirm that all computers/programs are running (not got stuck), including the QT HMI screen, the PDP screen, the target computer, the microwave+lifter computer, "uva-nuc-01" and "uva-nuc-02".
    • Check all strip charts and communicate with the Target Expert immediately if you notice anything unusual: especially IVC, LCW flow, LCW pressure, LCW temperature, LCW temperatures on QT compressors
    • Check
  • On-demand
    • Manipulate the Microwave Control system in case of the "Production" mode.
    • Respond to all target-related alarms, as instructed in this page.
  • End of shift
    • Hand over details to the incoming shifter.
    • If the Shift Leader is absent, complete the "End of Shift" form in the ECL.

...