- Ensure the "AUTO" control of the GV-Bypass PID is OFF.
- Fully open the GV-Bypass (wait until you can see the limit switch for OPEN is GREEN).
- Wait until the pressure is stabilized (here you have to coordinate with the Target Expert to find which pressure you will need it to be stabilized).
- Open GV (Gate Valve), and wait until the fridge pressure is stabilized.
- Fully close the GV-Bypass valve.
- Turn ON the boosters of the roots-stack.
- Crack open the RUN valve by 0.54 turns.