Here we organize the Operational Readiness Clearance (ORC) documents that needed to be submitted. Please "Click" on the title(s) to navigate to the dedicated page(s).
Target computer shutdown procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=7683
_____________________________________________________________________________________________________
Please use the information on this page (includes a DocDB number) for the full set of Spinquest Target System ORCs
_____________________________________________________________________________________________________
FNAL ORC Submission page: https://fermipoint.fnal.gov/service/tsworc/SitePages/Home.aspx
System | ORC # | Description | |
---|---|---|---|
Target Lifter | ORC-1837 | Lifter assembly | |
ORC-1837.01 | E1039 Target Lifter Addendum (re-installation) | ||
ORC-1865 | Lifter control system | ||
ORC-1866 | Lifter ADC system | ||
ORC-1877 | Lifter Monitoring system | ||
Microwave | ORC-1934 | Microwave motor controlling box | |
Slow control rack | ORC-1895 | Overall rack ORC | |
ORC-1969 | E1039 Slow Control Rack Update in NM4 Hall | ||
UVA-NMR | ORC-1854 | Custom components | |
UVA-NMR | ORC-1888 | Commercial Components | |
UVA-NMR | ORC-1888.01 | Addendum for operating from the cryo platform | |
Magnet Electronics (in-cave | ORC-2049 | Covers all the electronic connections on the magnet (in-cave) | |
Fridge Electronics | ORC-2050 | ORC2050_Fridge_Electronics.pdf | |
Magnet cooldown | ORC-2056 | ||
Polarized Target Final Walkthrough | ORC-2055 | ORC2055-E1039_Polarized_Target_system_final_walkthrough.pdf | |
Magnet | ORC-2171 | Heat Tapes for Target Cryogenic System at SpinQuest | |
Outside gHe tank | ORC-2199 | Pressure and Temperature Sensors for Outside Gaseous Helium Tank at SpinQuest | |
QT compressor | ORC-2205 | Temperature Sensors for LCW Outlet of QT Compressor at SpinQuest |
Click Updates Page to see some updates on scheduling, constructions etc.
Manuals & Sample docs:
i) Electrical Safety ORC Review Guidelines