2023


Liquefier A

Start timeStart Level
   (L)
Finish Time

Finish Level
       (L)

Dewar Set Pressure
       (PSI)
NV501A
Position
PRV501A
Position
(max flow when started)
Production
Rate (L/Hr)
UVA elog#
2023/07/26 18:00126.62023/07/27 at 01:30158.50    7.31/4 turns60slm and slowly decreased4.16552
2023/07/27 22:05126.62023/07/28 at 04:50156.15    7.3Fully Closed56slm and slowly decreased4.09567
2023/08/01  7:10
126.6
156.157.31/2 turnsNot changed4.37574
2023/08/02  9:33126.6
156.156.51/2 turnsNot changed4.30578
2023/08/03 11:10122.5
156.156.53/4 turnsNot changed4.24584
2023/08/04 11:45122.5
156.156.51/2 turnsNot changed4.10589
2023/08/05 14:3579.2

6.51/2 turnsNot changed4.19594
2023/08/09 12:3695
2006.51/2 turnsNot changedx

Computing scripts

Liquefier B

Start time

Start Level
     (L)

Finish Time

Finish Level
      (L)

Dewar Set Pressure
       (PSI)

NV501B
Position

PRV501B
Position

Production
Rate (L/Hr)

UVA elog#

2023/07/30 21:45126.62023/07/31 at 04:41156.156.01/4 turns50slm and slowly decreased3.48568
2023/07/31 16:30
126.6
156.156.01/4 turnsIncreased (elog 570)3.82573
2023/08/01 15:31126.6
156.156.01/2 turnsNot changed3.88576
2023/08/02 18:14126.6
156.156.03/4 turnsNot changed3.78580
2023/08/03 20:17126.6
156.156.01   turnNot changed3.91585
2023/08/04 22:34126.6
156.156.51/2 turnsNot changed2.91591
2023/08/05 13:0079.2
156.156.01/2 turnsNot changed(3.7)596
2023/08/07 14:45126.6
156.156.51/2 turnsIncreased (elog 597)3.93600
2023/08/08 09:37126.6
(155)6.51/2 turnsNot changed(3.8)613
2023/08/08 20:00(155)
2007.01/2 turnsNot changed(3.6)613
2023/08/11  11:3518.12023/08/11   17:0032.13.0" "3.61

Computing scripts

2022


Liquefier A

Start time (Manual  or
Transfer finish time)
Start Level
   (L)
Finish Time (Manual  or
Liquefy to Idle switch time)

Finish Level
       (L)

Dewar Set Pressure
       (PSI)
Outside Tank
Pressure Range (PSI)
Production
Rate (L/Hr)
12/29/2022 at  18:5371.4 12/31/2022  at 14:29225.2     6.095 - 75
























































Liquefier B

Start time (Manual or
Transfer finish time)

Start Level
     (L)

Finish Time (Manual or
Liquefy to Idle switch time)

Finish Level
      (L)

Dewar Set Pressure
       (PSI)
Outside Tank
Pressure Range (PSI)

Production
Rate (L/Hr)

12/28/2022 at 17:2883.212/30/2022 at 08:01221.26.097 - 80