After ~8mins: Open the magnet-bypass valve (hand-valve right next to the magnet flow controller) → Fully open the magnet return on the Cryo Control Panel → Open VJVT on the HMI screen.
After ~1min: Close VPC. Monitor the magnet pressure and maintain ~5psi using the pressure builder on the Dewar C.
After a couple of minutes, you will observe that the magnet pressure drops down suddenly and stay around ~1.4-1.5 psi (this indicates that LHe is flowing to the magnet after the pre-cooling of the last part of the transfer line).
Regulate the pressure difference of 3-4 psi between the magnet and the Dewar (during the entire fill), using the pressure builder on the Dewar C.
Fill the magnet until the level shows ~44% → Open VPC → Close VJVT → Close VJVC → Close Magnet bypass hand valve. Make sure that you leave the VPC open to capture all the boil-off from the transfer line until it is warm (check TX1).
Set the magnet return at about 30 SLM. Possibly enable the automated control to maintain the magnet pressure at 1.0 psi (which corresponds to about 0.3 psi on Cryo Control Panel).