You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

The following VI file should be kept running; "D:\e1039\labview_work\TestIR\bos_eos_mostreal_atBOS.vi".  It is to detect the BOS & EOS signals to update the BOS, EOS & SPILLCOUNTER variables on EPICS;

The turn-off/on procedures below are temporary as the configuration is being changed. The procedure is described by Misha in DocDB 7683 also.  We had better merge the documentation when appropriate.

Turn-Off procedure

  1. Write down the last spill ID, which is shown in the VI front panel.
  2. Close the VI file, by clicking the right-top Close button of the window.  Do not  save any change, if asked.
  3. Shut down the computer.

Turn-On procedure

  1. Make sure that the NIM bin with the gate generator for BOS/EOS is on.  It is in the bottom of the right most rack.
  2. Boot the computer and login as "e1039daq".
  3. Open the power shell and execute "camonitor BOS EOS SPILLCOUNTER", in order to check if you can establish connection to the EPICS server.
  4. Start the VI file, by double-clicking the file icon in the file browser.
  5. Turn on the network disks manually.  It is on the right side of the front panel.
  6. Replace the initial spill ID shown in the VI front panel with "last spill ID + 1" that you wrote down in the turn-off procedure.
  7. Start VI, by clicking the arrow icon in the VI front panel.




This page is dedicated to update the status of the Target Computer Setup at NM4 (kind of a log-book).


Date            Status/Update/Modification                                                                User's name           Additional notes                                                                     
















































  • No labels