The following VI file should be kept running; "D:\e1039\labview_work\TestIR\bos_eos_mostreal_atBOS.vi". It is to detect the BOS & EOS signals to update the BOS, EOS & SPILLCOUNTER variables on EPICS;
The turn-off/on procedures below are temporary as the configuration is being changed. The procedure is described by Misha in DocDB 7683 also. We had better merge the documentation when appropriate.
Turn-Off procedure
- Write down the last spill ID, which is shown in the VI front panel.
- Close the VI file, by clicking the right-top Close button of the window. Do not save any change, if asked.
- Shut down the computer.
Turn-On procedure
- Make sure that the NIM bin with the gate generator for BOS/EOS is on. It is in the bottom of the right most rack.
- Boot the computer and login as "e1039daq".
- Open the power shell and execute "camonitor BOS EOS SPILLCOUNTER", in order to check if you can establish connection to the EPICS server.
- Start the VI file, by double-clicking the file icon in the file browser.
- Turn on the network disks manually. It is on the right side of the front panel.
- Replace the initial spill ID shown in the VI front panel with "last spill ID + 1" that you wrote down in the turn-off procedure.
- Start VI, by clicking the arrow icon in the VI front panel.
This page is dedicated to update the status of the Target Computer Setup at NM4 (kind of a log-book).
Date | Status/Update/Modification | User's name | Additional notes |
---|---|---|---|