N | ORC-ID # | Title | Submitted | Reviewed | Approved | Div. Signed | Who | Notes | Sub-system |
1 | 1834 | E1039 Microwave Test Stand | 1 | 1 | 1 | 1 | W.Ahmed | Microwave | |
1834.01 | E1039 Microwave Test Stand | deprecated? | Microwave | ||||||
1834.02 | E1039 Microwave Test Stand (new control box) | deprecated? | Microwave | ||||||
2 | 1837 | E1039 Target Lifter System | 1 | 1 | 1 | 1 | V.Bandara | Target Lifter | |
1837.01 | E1039 Target Lifter Addendum (re-installation) | 1 | 1 | 1 | 1 | V.Bandara | Re-installation of the lifter in the target cave | Target Lifter | |
3 | 1847 | E1039 Roots Vacuum | 1 | 1 | 1 | 1 | A.Arora | Roots | |
1847.03 | E1039 addendum to ORC-1847 for gHe recovery piping | 1 | 1 | 1 | 1 | includes roots exhaust | Roots | ||
4 | 1853 | E1039 Magnet Power Supply Rack | 1 | 1 | 1 | 1 | W.Ahmed | Magnet | |
5 | 1854 | E1039 NMR system part 1 (custom electronics) | 1 | 1 | 1 | 1 | I. Fernando | NMR | |
6 | 1857 | E1039 Liquefaction Electrical System | 1 | 1 | 1 | 1 | W.Ahmed | UVA-QT | |
1857.01 | E1039 Liquefaction Electrical System | 1 | 1 | 1 | 1 | W.Ahmed | Small PLC cabinet on west wall | UVA-QT | |
7 | 1865 | E1039 Target Lifter Control System | 1 | 1 | 1 | 1 | V.Bandara | Target Lifter | |
8 | 1866 | E1039 Target Lifter ADC System | 1 | 1 | 1 | 1 | V.Bandara | Target Lifter | |
9 | 1867 | E1039 AC power dist for slow controls rack | 1 | 1 | 1 | 1 | S.Chappa | Slow Controls Rack | |
10 | 1877 | E1039 Target lifter monitor | 1 | 1 | 1 | 1 | V.Bandera | Target Lifter | |
11 | 1888 | E1039 NMR system part 2 (commercial components) | 1 | 1 | 1 | 1 | I.Fernando | NMR | |
12 | 1888.01 | E1039 NMR addendum | 1 | 1 | 1 | 1 | I.Fernando | NMR | |
13 | 1895 | E1039 Slow controls rack for the SpinQuest experiment | 1 | 1 | 1 | 1 | Z.Akbar | Slow Controls Rack | |
14 | 1933 | E1039 NMR rack quiet AC power | 1 | 1 | 1 | 1 | S.Chappa/RJT | NMR | |
15 | 1934 | E1039 Microwave motor controlling system (exp. Hall) | 1 | 1 | 1 | 1 | V.Bandara | Microwave | |
16 | 1938 | E1039 Helium Liquefaction plant | 1 | 1 | 1 | 1 | RJT/D.Keller | UVA-QT | |
17 | 1941 | E1039 ODH & Hazardous Gas Controls | 1 | 1 | 1 | 1 | K.Overhage | ODH | |
18 | 1954 | Spinquest (E1039) Fridge valve controlling system | 1 | 1 | 1 | 1 | V.Bandara | Fridge | |
19 | 1968 | E1039 Microwave test setup at counting hall | 1 | 1 | 1 | 1 | W.Ahmed | Microwave | |
20 | 1969 | E1039 Microwave setup in Hall | 1 | 1 | 1 | 1 | W.Ahmed | Microwave | |
1969.01 | E1039 Microwave setup in Hall (reinstall) | 1 | 1 | 1 | 1 | V.Bandara | Re-ORC after disassembly | Microwave | |
21 | 1970 | E1039 Annealing system at Hall (slow controls rack) | 1 | 1 | 1 | 1 | W.Ahmed | examine all 1970 docs. | Annealing |
1970.01 | E1039 Annealing system (Roots gate valve control box) | 1 | 1 | 1 | 1 | W.Ahmed | Annealing | ||
22 | 1982 | E1039 Magnet Power supply rack update | 1 | 1 | 1 | 1 | W. Ahmed | Magnet | |
1982.01 | E1039 Helium level addendum to ORC-1982 | 1 | 1 | 1 | 1 | W. Ahmed | Magnet | ||
23 | 1983 | E1039 Update Roots vacuum | 1 | 1 | 1 | 1 | W. Ahmed | Roots | |
24 | 1984 | E1039 VME based NMR system (LANL) | 1 | 1 | 1 | 1 | W. Ahmed | NMR | |
1984.01 | E1039 VME based NMR system Addendum (LANL) | 1 | 1 | 1 | 1 | M.Yurov | NMR | ||
26 | 2002 | E1039 LN2 delivery and gN2 vent piping | 1 | 1 | 1 | 1 | J.Kintner/RJT | LN2 piping | |
27 | 2008 | E1039 Liquid Helium transfer and cooldown piping | 1 | 1 | 1 | 1 | J.Kintner/RJT | LHe piping | |
25 | 2046 | E1039 NM4 ODH Controls | 1 | 1 | 1 | 1 | K.Overhage | ODH | |
28 | 2049 | E1039 Target Magnet (electronics) | 1 | 1 | 1 | 1 | I.Fernando | Magnet | |
29 | 2050 | E1039 Target Fridge (electronics) | 1 | 1 | 1 | 1 | K.Nakano | Fridge | |
30 | 2053 | E1039 Target cave Helium, nitrogen piping | 1 | 1 | 1 | 1 | V.Bandara | Piping | |
31 | 2056 | Target Magnet (cooldown cryogenics/mechanical) | 1 | 1 | 1 | 1 | I.Fernando | Magnet | |
Target magnet (Fridge addendum) | 1 | 1 | 1 | 1 | Magnet | ||||
32 | 2071 | Target Magnet Powerup | 1 | 1 | 1 | 1 | I.Fernando | Magnet and Fridge | |
34 | 2137 | E1039 Target Gate Valve bypass valve control box | 1 | 1 | 1 | 1 | V.Bandara | Piping and Roots | |
35 | 2162 | Polarized target insert (electronics & microwave) | 1 | 1 | 1 | 1 | I.Fernando | Delegated to E.Niner | Insert |
36 | 2167 | 2nd Microwave control box (for test stand) | 1 | 1 | 1 | 1 | V.Bandara | Microwave | |
37 | 2171 | Heat Tape for target cryostat | 1 | 1 | 1 | 1 | K.Nakano | Magnet | |
38 | 2186 | NMR Test Stand | 1 | 1 | 1 | 1 | A.Pattividana | L.Reger | NMR |
39 | 2199 | Outdoor gHe tank pressure/temp sensors & readout | 1 | 1 | 1 | 1 | K.Nakano | Slow Controls | |
40 | 2201 | Magnet gHe flow controller bypass control electronics | 1 | 1 | 1 | 1 | V.Bandara | Slow Controls | |
41 | 2205 | Temperature sensors for cryo-compressor water system | 1 | 1 | 1 | 1 | K.Nakano | Slow Controls | |
42 | 2213 | UVa NMR 3 channel box (test stand) | 1 | 1 | 1 | 1 | A.Pattividana | NMR | |
43 | 2164 | Final beam ORC for the experiment | R.Tesarek | ||||||
44 | |||||||||
Total | 196 |