You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 19 Next »


New Page: https://github.com/uva-spin


GitHub pages:
https://github.com/UVA-LabVIEW-Projects/LabVIEW-Projects
https://github.com/E1039-Collaboration/e1039-target-controls


LabView Vi's & associated information


InstrumentHardware                            Vi   avail.GitHub location(s)                                                                                                                                          Assignment     Test StatusInstall in the target computer
1

Magnet flow control (THCD)


In-progress           
Zulkaida/Harsha/Misha           

How about "*_forhere.vi".

Final setup??

MKS 946 and MKS 670 are included?


2

Separator flow control (THCD)

                       In-progress
Zulkaida/Harsha/Misha                     

3Fridge flow monitor (THCD)
In-progress
Zulkaida/Harsha/Misha 

4

Fridge nose level probe

AMI1700yeshttps://github.com/uva-spin/e1039-target-controls/tree/master/Cryo-ControlZulkaida

5

Run valve


In-progress
Harsha

6

Bypass valve


In-progress
Harsha

7

High Accuracy Signal Conditioner: MKS 670B

For pressure sensor (MKS 690A)Step #2

https://github.com/uva-spin/Temperature-Pressure-VIs/tree/main/MKS_670_VIs

Kenichi (& Zulkaida)

8

Vacuum System Controller: MKS 946

For pressure sensor (MKS 722B) * 2Step #4

https://github.com/uva-spin/Temperature-Pressure-VIs/tree/main/MKS_946_VIs

Kenichi (& Zulkaida)

9

DAQ for MCC E-TC for
annealing

Sensor type: Omega SA1 RTD

In-progressNeed to check the plan with WaqarWaqar? (Kenichi)

t.b.n.DAQ for Thermocouple: MCC E-TCSensor: Omega Type T, at target caveIn-progresshttps://github.com/UVA-LabVIEW-Projects/LabVIEW-Projects/tree/main/Delcaor%20(Complete)Kenichi?, Reggie?

10

LakeShore218  (8 channels)


yes
Reggie

Error on target computer:

Missing VIs: SQL Execute.vi, ADO Connection Create.vi, ADO Connection Open.vi, ADO Connection Destroy.vi.


11

LakeShore218 (Target Insert)
2 + (6: can be used for other)


yes
Reggie

12

Target Lifter


In-progress
Vibodha

13

Basic Microwave motor controller
& potentiometer


In-progress
Vibodha

14

EIP Frequency counter


In-progress

https://github.com/uva-spin/e1039-target-controls/tree/master/Motor%20controller

Vibodha

15Magnet OVCPfeifer Vacuumyes
Zulkaida

18

Magnet PS


yeshttps://github.com/uva-spin/e1039-target-controls/tree/master/Magnet-PS-ControlZulkaida/David

19

Shim PS


yeshttps://github.com/uva-spin/e1039-target-controls/tree/master/Magnet-PS-ControlZulkaida/David

20Mercury iTM
yes
Misha

21

Mercury iTC

N2 levelyeshttps://github.com/uva-spin/e1039-target-controls/tree/master/Magnet-PS-ControlZulkaida

22

Maxigauge


yeshttps://github.com/UVA-LabVIEW-Projects/LabVIEW-Projects/tree/main/Maxigauge%20VIsZulkaida

23

EV105-N (Electronic valve)

Fairchite     TA6000-104

no (one Vi)
Zulkaida

24

EV102-N (Electronic valve)

Asco 8222G 002LT

no (one Vi)
Zulkaida

25

TE107-N (Temp. Sensor)

OmegaSA1 RTD

no (one Vi)
Zulkaida

26

TE108-N (Temp. Sensor)

OmegaSA1 RTD

no (one Vi)
Zulkaida

27

PT106-N (Pressure Sensor)

DWIER 626-11-GH-P1-E4-S1

no (one Vi)
Zulkaida

28

PT110-N (Pressure Sensor)

DWIER 626-11-GH-P1-E4-S1

no (one Vi)
Zulkaida

Steps of VI Availability (Tentative)

  1. A few simple VIs for readout and configuration.  It is to confirm that the device can be controlled with LabVIEW.
  2. A complete set of VIs for readout and configuration.  Each VI should perform one function of the device.
  3. VIs for user interface. 
  4. VIs for continuous measurement.
  5. VIs for continuous logging.
  6. Note that an integrated user interface (like PDP) for all the devices that we use will be considered in a future.  We could use DQMH or CML DQMH.



Updates

DateTitle                                                                                                             Presenter               File                                                                                                                      

  

Update on LN2 BosVibodhaSCMeetig_August25.pptx

 


Zulkaida
  • No labels