The ITS Team will be performing maintenance on Confluence beginning at 6:00 pm Tuesday, Apr 8. During this time the service may go offline. It should be available again by 8:00 pm. Please refrain from editing pages during this time to avoid losing your work.
Contact Persons
System | Contact Person |
---|---|
QT | Ishara, Kenichi, Liliet, Farooq |
NMR | Syed, Farooq, Ishara, Liliet, Forhad, Vaniya |
Magnet System (in-cave piping) | |
Magnet Power supply rack | |
IVC | |
Control room computers | |
VI's | |
Target Lifter | |
Microwave | |
Target Material Related | |
Inventory |
System | Problem | Possible Cause | Steps to do |
QT | If the QT-HMI got frozen | How to fix the QT-HMI if its screen got frozen | |
If the Dewar level indicators have large fluctuations | Level sensor tubes are contaminated | Fixing dewar level indicator FNAL Approved procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10401 | |
Coldheads blocking alarm | Possible contamination or cold heads have been running so long without any intake gHe for a while | ||