Magnet Shield Fill: Routine Fill
Checklist:
- LL-106-N Shows < 75%.
- The level probe readout in the magnet power supply rack (cryoplatform) is ON, and the output from it to the PLC is ENABLE.
- PT-106-N is below 25 psig.
- PT-110-N reads a value between 20psig-60psig.
- Ensure EV-200-N is closed. It may be left open from an earlier time, since the purifier was filled.
- Ensure VNFA on the purifier overview LN2 is CLOSED.
- LN2 tank (Tank #54) outside has > 20 inwc level.
- HCV13 is CRACKED OPEN (on 12/21/2023 we decided to leave it at this position).
Steps:
- Open EV-102-N
- Open EV-100-N
- Monitor TE-104-N, TE-107-N, TE-108-N, and they should reach < 90 Kelvin.
- When the temperatures reach below 90 Kelvin, Open EV-105-N to 100% (input 100% + press 'Enter')
- Close EV-102-N.
- Monitor PT-106-N and ensure it doesn't reach above 25psig. If it reaches 25psig, then STOP the filling by Closing EV-100-N and Opening EV-102-N, then Close EV-105-N (input 0% + press 'Enter').
- Monitor LL-106-N reaching 90%.
- Close EV-100-N
- Open EV-102-N
- Close EV-105-N (input 0% + press 'Enter').
- After ~4 hrs, ensure TE-104-N, TE-107-N, TE-108-N are at room temperature and then Close EV-102-N.
Warm Magnet Shield Fill
Checklist:
- LL-106-N Shows ~0%.
- The level probe readout in the magnet power supply rack (cryoplatform) is ON, and the output from it to the PLC is ENABLE.
- PT-106-N is below 25 psig.
- PT-110-N reads a value between 20psig-60psig.
- Ensure EV-200-N is closed. It may be left open from an earlier time, since the purifier was filled.
- Ensure VNFA on the purifier overview LN2 is CLOSED.
- LN2 tank (Tank #54) outside has > 20 inwc level.
- HCV13 is CRACKED OPEN.
Steps:
- Open EV-102-N
- Open EV-105-N to 100% (input 100% + press 'Enter').
- Open EV-100-N
- Monitor TE-104-N, TE-107-N, TE-108-N, and they should reach < 90 Kelvin.
- When the temperatures reach below 90 Kelvin, then Close EV-102-N.
- Monitor PT-106-N and ensure it doesn't reach above 25psig. If it reaches 25psig, then STOP the filling by Closing EV-100-N and Opening EV-102-N, then Close EV-105-N (input 0% + press 'Enter').
- Monitor LL-106-N reaching 90%.
- Close EV-100-N
- Open EV-102-N
- Close EV-105-N (input 0% + press 'Enter').
- After ~4 hrs, ensure TE-104-N, TE-107-N, TE-108-N are at room temperature and then Close EV-102-N.