Please go through all these valve settings before starting the system to liquefy.


LocationValve / ParameterPosition / Value
Outside gHe tankMV107Open

MV108Open
HR3MV101Open

MV102Open

MV103Close

L7B (to the Buffer Tank)Open

Vliq1Open

V19Close

Vliq2Close

V18This is a 3-way hand valve: position→ gas flow downwards

VEVACClose

V30Open

V35Open

VPClose

V36Close

REGPOpen (fully)

V11Open

Vs4Close

VfillClose

VmupClose

V17Close

V14Open

NV2Close

SVPDAlways open (relay was taken out)

V12Close

V13Close

VDeprClose

FI01Completely Open

FI02Open (somewhere in the middle)

FI03Completely Close
Helium Supply ManifoldBV02Open

VfillClose

VventClose

MV501 A,BOpen

MV502 A,BOpen

MV503 A,BOpen

MV504 A,BOpen

MV505 A,BOpen
Helium Return ManifoldREGXOpen

VHSV and the rotatable valveClose
QT-HMI Liquefier A/BStatus

Before starting the Liquefiers
Screen Shot 2023-09-21 at 6.00.42 PM.png

When Running the Liquefiers


QT-HMI (Purifier → He Overview)V9aOpen

V21aOpen

V10a,bClose

V14 a,bClose

AV6 a,bClose

AV7Close

AV13Close

V9bClose

V21bClose
QT-HMI (System Overview)Mode

Before running the system → RUN + MANUAL

When running the system → RUN + AUTO


SV03Open

SV01Close

SVSAMPLE, SVREFClose

VPCOpen

VJVA, VJVB, VJVC, VJVTClose

SVNA, SVNBOpen
PurifierPurifier> 70% level
Helium Compressors
(when the system is running)

Purifier Screen (when the system is running)
(mainly v9a and v21a should be on
OPEN positions)

Purifier LN2 Overview:
Open VNVA





  • No labels