Updated on  


ProcedureDocdb IDPreviously ReviewedSource file available?
1QT system startup and shutdown 10364NoYes
2Pumping and purging (generic)10184Yes (Rick)Yes
3Leak checking (generic) 10188Yes (Rick)Yes
4Dewar evacuation10178Yes, HAYes
5QT Purifier LN2 fill 10337Yes (Jordan)Yes
6Magnet pre-cool 10032Yes, ORC-2056.01No
7Magnet cooldown9651Yes, ORC-2056.01No
8Magnet operations 10062Yes, ORC-2071No
9Magnet fill from commercial LHe Dewar 10056Yes, ORC-2056.01No
10Magnet LHe fill9670Yes, ORC-2056.01Yes
11Magnet shield LN2 fill 10337Yes, (Jordan)Yes
12Outside gHe tank refill 10198Yes, (Jordan)Yes
13Routing NMR cables 10357Yes, HAYes
14UVA-NMR system shutdown,startup,tuning, data-taking10367NoYes
15Slow Control System turn on/off10369NoYes
16Annealing System turning on/off10372NoYes
17Adjusting the Parallel plate valve PSV-401-He10333Yes (Rick)Yes
18Fridge LHe fill 10375Yes, ORC-2056.01Yes
19Filling magnet shield with portable LN2 Dewar10053Yes, HAYes
20Manually vented He Gas Storage Tank to the Atmosphere10285No (Sent to Rick)Yes
21Leak Checking in the Cave (Target Magnet) 10308Yes, (Rick)Yes
22HR3 Compressor Oil, Oil filter replacement10320NoYes
23Helium boiloff capture procedure 10282In ProgressYes
24Handling Target material NH3/ND310360In ProgressYes
25Filling the portable handheld dewar10358In ProgressYes
26Cold-heads warm-swap procedure10378Yes, HAYes
27Target lifter system powering up and shutting down procedure 10381NoYes
28Filling Purifier LN2 space using portable LN2 Dewar10053Yes, HA (Jordan)Yes
29Procedure for draining LCW from roots pumps10384Yes, HA (Rick)No (scanned from HA)
30LHe transfer using commercial LHe Dewar in the cave9670Yes, HA (Rick)No (scanned from HA)
31Microwave system powering up, Operation, and shutting down10387NoYes
32LHe transfer to QT storage dewars 10389Yes, HANo (scanned from HA)
33Installation of a transfer stinger to a Liquid Helium Dewar (generic)10392NoYes
34Cold LHe Transfer 10395NoYes
35QT Liquefier Dewar level cleaning and Dewar cleaning10401In ProgressYes
36UVA-QT Purifier Helium Space Cleaning Procedure10404YesYes
37UVA-QT Purifier LN2 Space Cleaning Procedure 10407YesYes
38Handling Target material CH2/CD210411In ProgressYes
39A Detailed description of upcoming plan10417In ProgressYes
40Plan for the usage of Ammonia for the target10414In ProgressYes
41Target insert loading/unloading procedure10355In ProgressYes
42Cleaning Procedure of roots LCW regulator10420NoYes
43Oil refilling/changing for rotary vane pump10422NoYes

























Previous version


ProcedureDocdb ID
1QT system startup and shutdown 10364
2Pumping and purging (generic)10184
3Leak checking (generic) 10188
4Dewar evacuation10178
5QT Purifier LN2 fill 10337
6Magnet pre-cool 10032
7Magnet cooldown9651
8Magnet operations 10062
9Magnet fill from commercial LHe Dewar 10056
10Magnet LHe fill9670
11Magnet LN2 fill 10337
12Target material change 3043
13Outside gHe tank refill 10198
14Routing NMR cables 10357
15UVA-NMR system shutdown,startup,tuning, data-taking10367
16Handling Target material NH3/ND310360
17Slow Control System10369
18Annealing System10372
19Adjusting the Parallel plate valve PSV-401-He10333
20Fridge LHe fill 10375
21Filling magnet shield with portable LN2 Dewar10053
22Manually vented He Gas Storage Tank to the Atmosphere10285
23Leak Checking in the Cave (Target Magnet) 10308
24HR3 Compressor Oil, Oil filter replacement10320
25QT Transfer line temperature before Cool down phase10328
26Helium boiloff capture procedure 10282
27Handling Target material10360
28Filling the portable handheld dewar10358
29Cold-heads warm-swap procedure10378
30Target lifter system powering up and shutting down procedure 10381
31Filling Purifier LN2 space using portable LN2 Dewar10053
32Procedure for draining LCW from roots pumps10384
33LHe transfer using commercial LHe Dewar in the cave9670
34Microwave system powering up, Operation, and shutting down10387
35LHe transfer to QT storage dewars 10389
36Installation of a transfer stinger to a Liquid Helium Dewar (generic)10392
37Cold LHe Transfer 10395
38QT Liquefier Dewar cleaning10401
39QT Liquefier Dewar level sensor tubes cleaning10401
40UVA-QT Purifier Helium Space Cleaning Procedure10404
41UVA-QT Purifier LN2 Space Cleaning Procedure 10407
42Handling Target material CH2/CD2 (HDPE)10411






  1. Pumping and purging (generic) procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10184
  2. Leak checking procedure:https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10188
  3. Dewar evacuation procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10178
  4. Cooldown procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=9651
  5. Target Superconducting Magnet Operations Procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10062
  6. Fill from Commercial LHe Dewar Procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10056
  7. Liquid Helium fill procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=9670
  8. Liquid Nitrogen fill procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10053
  9. Target magnet pre-cool procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10032
  10. Target change procedure: https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=3043
  11. gHe filling procedure (outside tanks): https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10198
  12. LN2 filling (to Purifier and to the Magnet shield) using outside LN2 tank : https://seaquest-docdb.fnal.gov/cgi-bin/sso/ShowDocument?docid=10337


Not yet on docdb

  1. QT system shutdown and restart procedure: Shut Down and Restart Procedures
  2. Slow control rack shutdown and restart procedure:  https://confluence.its.virginia.edu/display/twist/Slow+Controls
  3. Magnet rack shutdown and restart procedure:  https://confluence.its.virginia.edu/display/twist/Magnet+Rack
  4. Target computer shutdown and restart procedure:  https://confluence.its.virginia.edu/display/twist/Target+Computer+setup+at+NM4
  5. Insulation Vacuum (IVC) pump down procedure



Link to IMPACT-tool: https://www-esh.fnal.gov/pls/apex/f?p=129:1:12952119108779:::::

HAs

  1. HA-LN2-Fill-Magnet-Shield-using-portable-dewar_final.docx
  2. HA-QT-Coldheads.docx   and  HA-QT-Coldheads_final.pdf
  3. HA-QT-Purifier.pdf
  4. HA_For_Draining_LCW_at_RootsPumps.pdf
  5. HA-Helium-transfer-from-Commercial-Dewar-in-cave.pdf
  • No labels