You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

The subunits of the lifter system

  1. Lifter mechanical setup (in the target cave)
  2. Lifter control box (Slow controls rack)
  3. Lifter ADC Box (Slow controls rack)
  4. Lifter monitoring box (Control room)

Details of each unit

  • Lifter mechanical setup


  • No labels