You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

The main sections of the lifter setup

  1. Lifter mechanical setup (in the target cave)
  2. Lifter control box (Slow controls rack)
  3. Lifter ADC Box (Slow controls rack)
  4. Lifter monitoring box (Control room)
  • No labels