...
2. Wait for TX1 temperature to drop below 100K (~ 4 min with GV02 fully opened).
Once TX1 < 100 K, immediately transition to Step #3, otherwise (if you wait too long), then you will see the magnet gets pressurized up to 6psi.
3. Enable the Flow PID control of the Magnet Return Bypass at 65 slm.
...
2. Wait for TX1 temperature to drop below 100K (~ 4 min with GV02 fully opened).
Once TX1 < 100 K, immediately transition to Step #3, otherwise (if you wait too long), then you will see the magnet gets pressurized up to 6psi.
3. Enable the Flow PID control of the Magnet Return Bypass at 65 slm.
...