...
2. Wait for TX1 temperature to drop below 100K (~ 4 min with GV02 fully opened).
3. Enable the Flow PID control of the Magnet Return Bypass at 65 slm.
4. Open VJVT and wait for magnet pressure to increase to 6 PSI.
5. Open VJVT, Close VPC and proceed to the filling steps.
...