Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

2. After the FMR has stabilized, set the Liquefier A/B to "Manual + Idle", open SV501A/B (inlet valve), and set FC501A/BQM (see the box on the left of FC501A/B) at 45 SLM.
    Image Added
    Ensure the outlet valve SVNA/B is closed and the cold heads of the Liquefier are off.

...