The different pre-cooling procedures are given below. Please confirm with the target expert the pre-cooling mode to be conducted. 

Slow Pre-cooling:

1. Enable the Flow PID control of the Magnet Return Bypass at 65 slm.

...

Proceed to the filling steps anytime after the transfer lines are cold. The system is sufficiently cold once the Tank T temperature decreases after opening VJVT (about 4 hours).

Fast Pre-cooling:

1. Open VJVA/B (ensure VPC is already opened).

...

5. Close VPC and proceed to the filling steps.

Fast+Slow pre-cooling: