We get the best transfer efficiencies when the transfers transfer lines from the Liquifier to the magnet are sufficiently cold. We have tested two modes (paths) to pre-cool the system: the slow and the fast pre-cooling as well as a combination of these two modes which allows us to reduce the slow pre-cooling time. During the slow pre-cooling we can estimate when the system is cold enough through the behavior of the Tank T temperature.

The fast pre-cooling transfer efficiencies are about 47-49% which does not allow to fill filling the entire magnet entirely volume using just one Liquifier although . Nevertheless, higher efficiencies of about 54% can be obtained with the fast pre-cool if the Liquifier pressure is reduced to 3.5 PSI at the expense of near nearly 2 hours (~8L) where the Liquifier is not producing while reaching the set pressure. Although the fast pre-cooling has a lower transfer efficiency the procedure could be performed when the magnet needs to be filled immediately and the slow pre-cool hasn't been done because any of the Liquifiers are near full.

The slow pre-cooling has consistently given the higher transfer efficiencies between 56 and 58% but requires long pre-cooling times (~ 4 to 5 hours) with the potential benefit of a slow filling which is still under study.  During the slow pre-cooling we can estimate when the system is cold enough through the behavior of the Tank T temperature.

 The . The reported efficiency values were obtained by performing the magnet fill from the seam level all the way to the level probe spike. 

...

Proceed to fill the magnet anytime after the transfer lines are cold. The system is sufficiently cold once the Tank T temperature decreases after opening VJVT (about 5 hours). The figure below shows an example of the Tank T behavior during a slow pre-cooling.

Fast pre-cooling:

1. Enable the Flow PID control of the Magnet Return Bypass at 65 slm.

2. Open VJVA/B, open VJVT and close VPC.

  • Filling

1. Open the MagRetBypass valve fully by pressing the "Full Open" button on "MagRetBypass_Main.vi" in CCP and wait until you can see it is fully open on the CCP panel. The magnet pressure will start decreasing. The FMR may spike momentarily.

...