Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Monitor the Liquifier A/B pressure until the cold-head temperatures are below 5.5 K and ensure ensuring the Liquifier A/B pressure doesn't go above 9 psi:

...