- Select a QT liquefier ("Liq") for the magnet filling. Liq should contain at least 200 L of Helium.
- Change the mode of Liq to Auto + Idle.
- Change the pressure set point of Liq to 4.0 psi. It will take >1 hour for the pressure to go down to the set point.
- Start to cool down the transfer line by opening VPC and VJVA/B.
- This is the start time of the transfer. Record the time, the magnet level and the Liq level.
- Monitor TX1 and wait until it reaches below 100K (for ~10 minutes).
- Usually TX1 first rises slightly (by 1-2 K).
- Disable the auto control of the MagRetBypass valve.
- Open the MagRetBypass valve fully.
- Open VJVT and close VPC.
- Change the mode of Liq to Manual + Idle.
- Open SV501A/B.
- Set FC501A/B at 60 SLM.
- If the actual inflow (FC501A/BI) is lower than its set point (FC501A/BQ), change the mode of the other liquefier to "Idle" so that PT501A/B rises.
- Turn off all the five cold heads of Liq.
- Confirm that the pressure of Liq is increasing.
- If it isn't, turn on all the five heaters of Liq until the pressure differential (between Liq & Mag) becomes 3.0 psi. Then turn them off.
- Wait until the pressure differential (between Liq & Mag) becomes 3.5 psi.
- Usually the magnet pressure (PTMR3) goes up to 2.0 psi and then down slowly to 1.5 psi.
- Set FC501A/B at 55 SLM.
- Maintain the pressure differential at 3.0-3.5 psi, by adjusting FC501A/B.
- Usually you change FC501A/B with a step of 5 SLM down to 40 SLM (i.e. 50 → 45 → 40 SLM).
- You have to increase FC501A/B when the pressure differential becomes smaller than 3.0 psi.
- Keep until the magnet level reaches 40% (135 L).
- Close VJVA/B. Open VPC. Close VJVT.
- This is the end time of the transfer. Record the time, the magnet level and the Liq level.
- Enable the auto control of the MagRetBypass valve. Change the set point to 1.5 psi if needed.
- Turn on all the five cold heads of Liq.
- Wait until the cold-head temperature becomes <10 K.
- Change the Liq settings as follows:
- The pressure set point of Liq
- is the original value set before you started this procedure.
- The outlet flow is 40 SLM.
- The Liq mode
- is Auto + Liquefy.
- If you change the mode of the other liquefier, change it back to Liquefy.
- Wait until the inlet flow becomes 60 SLM (i.e. max).
- Lower the outlet flow to 2 SLM with a step of 10 SLM. If the Liq pressure goes up, increase the outlet flow and wait until the pressure goes down.
- Confirm that the Liq pressure stays around the set point. If it keeps going up, set the outflow (FCA/B) at 40 SLM, wait for 5 minutes, set it back at 2 SLM, and confirm again.