...
- Start the transfer from QT deawar A and monitor the magnet pressure
- Open VJVA
- Open VJVT
- Close VPC
- Change the mode to Liquify if needed.
- When the magnet pressure reaches 5 psig, set the magnet return bypass valve to Auto Control with Flow and change the set point to 35 SLM.
- It should maintain the following conditions in the magnet.
- Maintain the magnet bypass return flow at 35 SLM.
- Magnet pressure < 5 psi
- Maintain the above magnet condition approximately for 5 days until the Coil T and Coil B temperatures reach ~40 K.
...