  1. Start the transfer from QT deawar A and monitor the magnet pressure
    • Open VJVA
    • Open VJVT
    • Close VPC
  2. Change the mode to Liquify if needed.
  3. When the magnet pressure reaches 5 psig, set the magnet return bypass valve to Auto Control with Flow and change the set point to 35 SLM.
  4. It should maintain the following conditions in the magnet.
  5. Maintain the magnet bypass return flow at 35 SLM.
  6. Magnet pressure < 5 psi
  7. Maintain the above magnet condition approximately for 5 days until the Coil T and Coil B temperatures reach ~40 K.

...