Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The main sections of the lifter setup

  1. Lifter mechanical setup (in the target cave)
  2. Lifter control box (Slow controls rack)
  3. Lifter ADC Box (Slow controls rack)
  4. Lifter monitoring box (Control room)