...
QT portion of the HR3
Add the P&ID
HR3 control box: normal operation configuration (06/16/2023)
Normally opereration mode (06/16/2023)
Valve | State |
---|---|
Vliq1 | Open |
V19 | Closed |
Vliq2 | Closed |
V18 | This is a 3-way hand valve: position→ gas flow downwards |
VEVAC | Close |
V30 | Open |
V35 | Open |
VP | Close |
V36 | Close |
REGP | Open (fully) |
V11 | Open |
Vs4 | Close |
Vfill | Close |
Vmup | Close |
V17 | Close |
V14 | Open |
NV2 | Close |
SVPD | Always open (relay was taken out) |
V12 | Close |
V13 | Close |
VDepr | Close |
FI01 | Completely Opened |
FI02 | Open (somewhere in the middle) |
FI03 | Completely Closed |
MV101-He | Open (from tank) |
MV1020-He | Open (to tank) |
MV103-He | Close |
...