Front Penetration (55 ft to cryoplatform) : All other cabling
West Penetration
--------------------------------(Cryo)---------------------------------------------------------------------------------------------------------------
Cryogenics
Vapor return for QT transferline (0.5 inch SS/copper line with 0.5-1 inch foam)
...
He gas (1/8 hose HDPE for gas lines for backfilling fridge)
(
Electrical
...
SuperConducting Magnet Power:
...
Shim power (two 7 mm cable)
Top ceiling Penetration
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Magnet boil off exhaust (25 mm flex hose with 0.5-1 inch foam) back to QT T-ed outside of cave to Quench relief outside of Hall
LN2 port exhaust (25 mm flex hose with 0.5-1 inch foam) should have a fan pulling vapor
East Penetration
(less than 47ft from target to cryo-platform)
---------------------------------------
NMR lines <30 mm dim collection of multiple coax (highly length sensitive)
------------------------------------------------------------------------------------------------------
NMR lines - Highly Length Sensitive
Quantity:
Diameter (each):
Diameter (Collective): < 30mm
Part Number:
EIP Microwave Frequency Counter (Gorex):
...
Diameter: 0.210"
Length:
Top Front-East Opening
(shortest length is about 55ft from target to cryo-platform)
--------------------------------------------------------------------------------------------------------------------------------------------
...