This page is related to the video.
Part 1: Storing
- Show that there are two Dewars (Dewar #3 and Dewar #4 inside the iron cage)
* labeled with appropriate Hazard material signage
* covered the top part of the cage with plastic board for weather conditions.
* has a padlock and a key (stored at the NM4 control room key tree). - Dewar #2 has just arrived from UVA.
- Wear PPE: closed-toe+impermeable shoes, tyvek suit, Safety goggles, face shield, Cryo-gloves, and long pants.
- Transfer the 3 bottles from the canister in Dewar #2 to a canister in Dewar #3, and update the inventory.
- Lock the cage and keep the keys in the control room key tree.
Part 2: Transporting from Iron-cage to NM4
- Wear PPE: closed-toe+impermeable shoes, tyvek suit, Safety goggles, face shield, Cryo-gloves, and long pants.
- Fill the Dewar #5 with LN2 which can contain ~10L, and bring it to the cage.
- Transfer the 3 bottles of NH3/ND3 from the canister in Dewar #3 to Dewar #5.
- Bring Dewar #5 to the back of the hall at NM4.
- Transfer the 3 bottles from the canister in Dewar #5 to Dewar #1.
Part 3: Load the materials to the target insert cups
Part 4: Loading the target insert
Part 5: Unloading the target insert
Part 6: Unloading the exhausted material from the target insert cups.
Part 7: Bringing the exhausted material from NM4 to the iron cage