West Penetration
--------------------------------
(Cryo)
Vapor return for QT transferline (0.5 inch SS/copper line with 0.5-1 inch foam)
QT transferline for LHe magnet filling (see QT step)
Main Flow (10 inch SS)
Separator Flow (25 mm flex hose with 1-2 inch foam)
LN2 fill (copper tubing with 5-6 inch foam)
He gas (1/8 hose HDPE for gas lines for backfilling fridge)
(Electrical)
Magnet power (two 14 mm cables) (66 ft from magnet to magnet power-supply on cryo-platform)
Internal magnet sensors
External magent sensors TC lines (sixteen 1 mm cables) (highly length sensitive)
LHe level probe (one 7 mm cable)
LN2 level probe (one 7 mm cable)
Shim power (two 7 mm cable)
Top ceiling Penetration
-------------------------------
Magnet boil off exhaust (25 mm flex hose with 0.5-1 inch foam) back to QT T-ed outside of cave to Quench relief outside of Hall
LN2 port exhaust (25 mm flex hose with 0.5-1 inch foam) should have a fan pulling vapor
East Penetration (less than 47ft from target to cryo-platform)
--------------------------------
NMR lines <30 mm dim collection of multiple coax (highly length sensitive)
EIP cable 4 mm gore cable
Front Opening (remove one set of hand stacked shielding, shortest length is about 55ft from target to cryo-platform)
--------------------------------
(Other)
Water lines for Microwave (two 3/8" SS tubing)
Pneumatic air lines (two 3/8" SS tubing)
(Cryo)
Manometer (25 mm flex hose with 1-2 inch foam)
(Electrical)
Annealing cables (one 7 mm cable)
Insert sensors (one 7 mm cable)
Fridge sensors (one 7 mm cable)
2 pressure sensors cabling (twp 7 mm cable)
Microwave HV cables to PS (one 20 mm cable) Needs line conditioner
Microwave stepper controls (three 4 mm cable)
Actuator controls (two 7 mm cable)