Operational Settings: QT_Operational_Settings.pdf
Procedures
- Filling LN2 on Purifier Dewar
- QT System Starting Procedure
- Liquefier Cleaning when Dewar contains LHe
- Cleaning QT purifier Helium-space
- Cleaning QT purifier LN2 space
- What to do when cold-heads "blockage" warning appear?
Useful information
- The volume of an outside gHe tank: 1600 cubic feet
- QT recommendation to keep system minimally pressurized: ~20 psi
- Running from 40 psi down to 20 psi would produce about 80 liquid litters and we should be able to do that in about 10 hours
- HR3.docx
To check LCW parameters: https://e906-gat1.fnal.gov/data-summary/e1039/slow-cont-acnet.php
(click on NM4LCW or select )
To check HMI parameters: https://e906-gat1.fnal.gov/data-summary/e1039/target-QT-HMI.php (select:
P&IDs
P504 HR3 P&ID 20191209 SSG.pdf
P504 P&ID (AO) Feb 26, 2020 -reprint.pdf
Manuals