New Page: https://github.com/uva-spin
GitHub pages:
https://github.com/UVA-LabVIEW-Projects/LabVIEW-Projects
https://github.com/E1039-Collaboration/e1039-target-controls
Instrument | Hardware | Vi avail. | GitHub location(s) | Assignment | Test Status | Tested on target computer? | Notes | |
---|---|---|---|---|---|---|---|---|
1,2,3 | Flow control (HFC) for magnet, Flow control (HFC) for separator, (Main) flow monitor (HFM) for fridge | THCD-400 | In-progress | https://github.com/uva-spin/Temperature-Pressure-VIs/blob/main/THCD_400_VIs/thcd_400_control_1.vi | Misha (Zulkaida/Harsha) | Yes | Next Step: Connect flow control right before the KNF pump | |
4 | Fridge nose level probe | AMI1700 | yes | https://github.com/uva-spin/e1039-target-controls/tree/master/Cryo-Control | Zulkaida | In-progress | ||
5 | Run valve | In-progress | Harsha | |||||
6 | Bypass valve | In-progress | Harsha | |||||
7 | High Accuracy Signal Conditioner: MKS 670B | For pressure sensor (MKS 690A) | Step #2 | https://github.com/uva-spin/Temperature-Pressure-VIs/tree/main/MKS_670_VIs | Kenichi (& Zulkaida) | Yes | ||
8 | Vacuum System Controller: MKS 946 | For pressure sensor (MKS 722B) * 2 | Step #5 | https://github.com/uva-spin/Temperature-Pressure-VIs/tree/main/MKS_946_VIs | Kenichi (& Zulkaida) | Yes | ||
9.1 | DAQ for MCC E-TC for | Sensor: Omega SA1 RTD * 2 | In-progress | Same as #9.2 | Kenichi | |||
9.2 | DAQ for Thermocouple: MCC E-TC | Sensor: Omega Type T, at target cave | Step #5 | https://github.com/uva-spin/Temperature-Pressure-VIs/tree/main/MCC_ETC_VIs | Kenichi, Reggie? | |||
10 | LakeShore218 (8 channels) | In-progress | Reggie | Yes | ||||
11 | LakeShore218 (Target Insert) | In-progress | Reggie | Yes | ||||
12 | Target Lifter | In-progress | Vibodha | |||||
13 | Basic Microwave motor controller | In-progress | Vibodha | |||||
14 | EIP Frequency counter | In-progress | https://github.com/uva-spin/e1039-target-controls/tree/master/Motor%20controller | Vibodha | ||||
15 | Magnet OVC | Pfeifer Vacuum | yes | Zulkaida | ||||
18 | Magnet PS | yes | https://github.com/uva-spin/e1039-target-controls/tree/master/Magnet-PS-Control Magnet Power Supply Operation | Zulkaida/David | ||||
19 | Shim PS | yes | https://github.com/uva-spin/e1039-target-controls/tree/master/Magnet-PS-Control Magnet Power Supply Operation | Zulkaida/David | ||||
20 | Mercury iTM | yes | Misha | |||||
21 | Mercury iTC | N2 level | yes | https://github.com/uva-spin/e1039-target-controls/tree/master/Magnet-PS-Control | Zulkaida | |||
22 | Maxigauge | yes | https://github.com/uva-spin/Temperature-Pressure-VIs/tree/main/Maxigauge%20VIs | Zulkaida | ||||
23 | EV105-N (Electronic valve) | Fairchite TA6000-104 | no (one Vi) | Zulkaida | ||||
24 | EV102-N (Electronic valve) | Asco 8222G 002LT | no (one Vi) | Zulkaida | ||||
25 | TE107-N (Temp. Sensor) | OmegaSA1 RTD | no (one Vi) | Zulkaida | ||||
26 | TE108-N (Temp. Sensor) | OmegaSA1 RTD | no (one Vi) | Zulkaida | ||||
27 | PT106-N (Pressure Sensor) | DWIER 626-11-GH-P1-E4-S1 | no (one Vi) | Zulkaida | ||||
28 | PT110-N (Pressure Sensor) | DWIER 626-11-GH-P1-E4-S1 | no (one Vi) | Zulkaida | ||||
29 | TPG361 | Pfeiffer Vacuum | Need testing | https://github.com/uva-spin/Temperature-Pressure-VIs/tree/main/TPG361_Version2 | Zulkaida |
Sensor Device | N | Sensor Location | Controller Device | Controller Location | Front End |
---|---|---|---|---|---|
TH HFC-303 | THCD-400 #1 | Slow-control rack | Target computer | ||
TH HFM-305 | THCD-400 #1 | ||||
??? | 5 | roots LCW inflow | Arduino?? | ?? | Target computer? |
??? | 1 | NM4 LCW inflow | n/a | n/a | ACNET |
Sensor Device | Sensor Location | Controller Device | Controller Location | Front End |
---|---|---|---|---|
Pfeiffer PKR 361 | Pfeiffer TPG 361 | Slow-control rack | Target computer | |
MKS 722B | Close to the separator pump, in return line from the root pump?? | MKS 946 #1 | Slow-control rack | Target computer |
MKS 722B | Next to MKS 690 (100 Torr)?? | MKS 946 #1 | ditto | ditto |
MKS 690; 100 Torr | Fridge via flex hose | MKS 670 | Slow-control rack | Target computer |
MKS 690; 1000 Torr | MKS 670 | Slow-control rack | Target computer | |
MKS 615 | MKS 670 | Slow-control rack | Target computer | |
Pfeiffer Vacuum | QT Manifold | Maxigauge | Magnet Rack | Target computer |
Pfeiffer Vacuum | ROOT Exhaust | Maxigauge | Magnet Rack | Target computer |
Pfeiffer Vacuum | Nitrogen Reservoir | Maxigauge | Magnet Rack | Target computer |
Pfeiffer Vacuum | Separator | Maxigauge | Magnet Rack | Target computer |
Pfeiffer Vacuum | Magnet | Maxigauge | Magnet Rack | Target computer |
Pfeiffer Vacuum | Nose (3) | Maxigauge | Magnet Rack | Target computer |
Pfeiffer | ROOT pumps(?) | Maxigauge(?) | Magnet Rack | Target computer |
Sensor Device | N | Sensor Location | Sensor in place | Cable in place | Controller Device | Controller Location | Controller in place | Front End | Notes |
---|---|---|---|---|---|---|---|---|---|
Type-T TC | 8 | Magnet coils | Yes | No | MCC E-TC #1 | Slow-control rack | No | Target computer | |
1 | No | No | MCC E-TC #2 | Slow-control rack | No | Target computer | |||
Type-T TC | 3 | LHe QT fill line (2 vacuum layer, 1 on stinger) | No | No | MCC E-TC #2 | ditto | ditto | ditto | |
1-2 | No | No | MCC E-TC #2 | ditto | ditto | ditto | |||
TC | 2 | Microwave cooling (1 on EIO, 1 on cooling water) | No | No | MCC E-TC #3 | Slow-control rack | No | Target computer | |
TC | 1-2 | Magnet IVC | No | No | MCC E-TC #3 | ditto | ditto | ditto | |
TC | 1 | Separator line | No | No | MCC E-TC #3 | ditto | ditto | ditto | |
TC | 1 | Top seal of fridge | No | No | MCC E-TC #3 | ditto | ditto | ditto | |
TC | 2 | Fridge for Waqar's annealing system | No | No | ?? | Annealing Panel | No | ?? | |
TC | 2 | Fridge for Henery's annealing system | No | No | ?? | Annealing Panel | No | ?? | |
This section is to discuss and share the overall configuration about computers and programs that we expect. The required spec of each program might depend on this configuration.
Date | Title | Presenter | File |
---|---|---|---|
| VIs for MCC E-TC | Kenichi | labview_20210810.pdf |
| Update on LN2 Bos | Vibodha | SCMeetig_August25.pptx |
| Zulkaida | ||
| Step count ADC length relationship | Vibodha | |
| Updates on slow control rack and target computer | Kenichi | labview_20210915.pdf |
| MKS 670 + PDP and LakeShore 218 + GPIB | Kenichi | labview_20210922.pdf |
| VIs for MCC E-TC | Kenichi | labview_20210929.pdf |
| VIs for MCC E-TC | Kenichi | labview_20211013.pdf |
| Lifter Vi update | Vibodha | |
| MCC E-TC & Slow Control Data Monitor | Kenichi | labview_20211103.pdf |
| Slow Control Data Monitor & MCC USB-202 | Kenichi | labview_20211110.pdf |
| Slow Control Data Monitor & MCC E-TC with long TC | Kenichi | labview_20211117.pdf |
| Some list about pressure sensor | Zulkaida | |
| Slow Control Data Monitor, NMR Computer & MCC USB-202 with TC | Kenichi | labview_20211124.pdf |
| NMR computer & MKS 615 | Kenichi | labview_20211201.pdf |
| Lifter VI | Vibodha | |
| Slow-Control System, NMR Computer & MKS 615 | Kenichi | labview_20211208.pdf |
| Test of MKS 615 with LN2 Test of MCC E-TC + Long TC in LN2 | Kenichi Kenichi | |
| TCP/IP communication of spill info, N of sweeps/measurement on PDP | Kenichi | slow_cont_20220119.pdf |
| PDP Readout Test | Kenichi | slow_cont_20220126.pdf |